background image

 
 
 
 

 

 

 

- 13 - 

 

 

Cleaning  

 

Cleaning Procedure 

When working with any chemicals, follow accepted safety practices.  Use eye and 

skin protection and positive ventilation when needed. 

1.  Obtain equipment:  

  Pump 

  Hoses 

  5 Micron Filter 

  Mixing Tank 

  Cleaning chemicals 

  Rags 

  Protective gear 

2.  Prepare the GRO unit for cleaning:  

a.  Disconnect the pump discharge manifold from the pump and connect the manifold to the 

cleaning system.   

b.  Place the product line from the RO unit into the mixing tank.   
c.  Disconnect the reject line coming from the last membrane and place it in the mixing tank.   
d.  To make up the cleaning solution, mix sodium hydroxide (NaOH) with RO product water (2 

gallons of water per membrane) to obtain a 0.1% solution (pH 11-12, 30 degrees C maximum 

water temperature).   

3.  Once the solution is mixed, pump it through the membranes at less than 50 PSI and recirculate 

back to the mixing tank for 30 minutes. 

Test both reject and product water for traces of cleaning or 

disinfection chemicals before sending water to the service 

connection or product storage. 

4.  After cleaning, the RO product water should be pumped to drain for at least 10 minutes or until the 

water is clear. 

If the water quality and/or production does not change after correcting 

ALL of the conditions listed in this section and performing a thorough 

cleaning, contact your GRO supplier for assistance. 

 

 

 

Содержание GRO

Страница 1: ...mo os si is s W Wa at te er r T Tr re ea at tm me en nt t S Sy ys st te em m I I N N S S T T A A L L L L A A T T I I O O N N O O P P E E R R A A T T I I O O N N A A N N D D M M A A I I N N T T E E N N...

Страница 2: ...this manual The Seller reserves the right to make enhancements or changes that may not be included in the manual Therefore it is understood that the material presented here is subject to change withou...

Страница 3: ...y Electricity and water DO NOT MIX Every effort is made to insure that the electrical equipment on our systems is resistant to water intrusion Once installed the system is subject to many factors beyo...

Страница 4: ...nts Section Page System Specifications 5 Installation 6 Operation 9 System Maintenance 10 Cleaning 12 Troubleshooting 14 Drawings GRO 150 700 RO PSI Diagram GRO 150 700 RO Unit Layout GRO 150 700 Elec...

Страница 5: ...2 1 97 3 8 1 4 1 4 Note 1 Product flow is the MAXIMUM recommended flow 2 Reject flow is the MINIMUM recommended flow 3 Pump pressure must not exceed 200PSI 13 4 Bar Typical Operating Parameters SPECIF...

Страница 6: ...zes a booster pump in an enclosed area be sure that there is adequate ventilation to dissipate the heat from the motor Otherwise the heat buildup can weaken the plastic tubing and may cause it to burs...

Страница 7: ...atic carbon filter is used it should be set to regenerate when the RO unit is not running usually at night Hookups 1 Supply Connect the carbon filter to the GRO unit at the prefilter using non corrosi...

Страница 8: ...irecting the water to drain 2 Connect the tank from the inlet to outlet and run the water through the tank for an additional 5 minute rinse to drain Failure to follow backwash and rinse the carbon tan...

Страница 9: ...ortant when determining the system s performance over time For the most accurate TDS readings let the GRO unit run for at least 15 minutes Unit Shutdown The standard GRO system with no options is turn...

Страница 10: ...Feed water temperature should be kept below 100 degree F 37 5 degrees C Membranes Always keep moisture in the membrane pressure vessel and always keep the ends plugged be careful not to cross thread o...

Страница 11: ...r sequester calcium carbonate ferrous iron and calcium sulfate from the feed water via water softening or an anti scalant chemical feed system Use test kit to check water quality Follow these basic gu...

Страница 12: ...n at 25 degrees C 2 TDS level increase As the TDS Total Dissolved Solids level climbs the amount of water passing through the membrane decreases If the TDS level has climbed since the time of installa...

Страница 13: ...he cleaning solution mix sodium hydroxide NaOH with RO product water 2 gallons of water per membrane to obtain a 0 1 solution pH 11 12 30 degrees C maximum water temperature 3 Once the solution is mix...

Страница 14: ...R possible reasons 1 O ring by pass on membranes 2 Chlorine damage to membranes 3 Temperature increase 4 Reverse flow through membrane causing a rupture in the membrane PERMEATE TDS TOO HIGH possible...

Страница 15: ...15...

Страница 16: ...16 Rev 4 October 2018...

Отзывы: