background image

I� 

Negative  Sequence  Filter 

Adjustment.  of  the  filter 

resistor  to  obtain 

no  response  to  positive  sequence 

currents 

is 

obtained  as  follows: 

a

Connect  terminal 

to  terminal 

14 

b

Remove  tap  screw  from  the 

COQ 

element 

c

Pass 

10 

amperes 

into 

terminal 

and  out 

terminal 

13 

d

With  a  low  reading,  high  resistance  Rectox 

voltmeter, 

measure 

the 

voltage 

between 

termiual 

and  the  tap  plate. 

e

Place  the  voltmeter  across  terminals 

and 

8. 

Adjust  the 

resistor  lead  on  the  right 

of  the  reactor 

until 

the  voltmeter  reads 

1.732 

times  the  voltage  reading  of  step 

(

d. 

Adjustment  of  the  filter  resistance  to  ob­

tain  no  response  to 

the  zero  sequence  current 

is  conveniently  made  by 

referring  to  Fig.  5. 

Pass  5  amperes  into  terminal  8  and  10  amperes 

into  terminal  7. 

Adjust  the  resistor  lead  on 

the  left  of  the  reactor  until  the  voltmeter 
reads  zero. 

TIME  CURVE  CALIBRATION 

With  the  time  dial  set  on  " 0"·, 

wind  up  the 

spring  until  approximately 

5-1/2  convolutions 

show. 

This  is  an  initial  rough  adjustment. 

From  this  preliminary  setting, 

minimum  tap  setting  and  time  dial 
"11", 

adjust  the  permanent  magnet 

relay  operates  in 

8 . 2   seconds 

and 

using 

setting  of 

until  the 

with  15.6 

amperes  single  phase  or  3 

per 

unit  between 

terminals  8  and  14. 

This  adjustment  is  made 

by  means  of  the  damping  magnet  screw. 

A  dia­

gram  of  the  test  connections  is  shown 

in 

Fig. 

6. 

Next  adjust  the  spring  tension  until  the 

relay  will  close  contacts  in  90  seconds  with 

5.2 

a

m

p

e

r

e

s  single 

per  unit  negative 

between  terminals  8 

phase  (tap  value  or  one 

sequence  current) 

applied 

and  14. 

This  adjustment 

is  made  by 

means  of 

the  spiral  spring  ad­

juster.  All  spring  convolutions  must  be  free. 

TRIP  CIRCUIT 

Universal  Trip 

This  combination  uses  a  2.0  amp. 

contactor 

s*itch  and  a  0.2  amp. 
connected  in  parallel. 

operation 

indicator 

Adjust  the  conta.ctor 

switch  and  indicator  a.s  outlined  below; 

Contactor  Switch  - Turn  the  relay  up  side 

down. 

Screw  up  the  core  screw  until  the  con-

tact  ring  starts  rotating. 

Now  back  off  the 

core  until  the  contact 

ring  stops  rotating. 

Back  off  the  core  screw  one  more  turn  and  lock 

in  place. 

Adjust  the  two  nuts  a.t  the  bottom 

of  the  switch  so  that 

there  is 

3/32  inch 

clearance  between  the  moving  contact  ring  and 
the  stationary  contacts  in  the  open  position. 

The  guide  rod  may  be  used  as  a.  scale  as  it  has 

52  threads  per  inch,  therefore, 

turns  of  the 

nuts  will  equal  approximately  3/32  inch. 

Combination  Test  - Close  the  main  relay  con­

tacts  and  pass  2.25  amps  d.c.  through  the  trip 
circuit. 

The  conta.ctor  switch  must  pick-up. 

Adjust  the  operation 

indicator  by  moving  the 

flag  holder  such  that  the  indicator  operates 
with  the  application  of 

the  2. 

25 

amps.  Pass 

30  amps  d. c. 

through  the  trip  circuit. 

The 

indicator  and  contactor  switch  must  not  stick 

in  the  operated  position  when  the  current  is 

interrupted. 

www 

. ElectricalPartManuals 

. com 

Содержание COQ Series

Страница 1: ...end and a pin and olive bearing on the upper end Both shaft bearings as well SUPERSEDES I L 41 277A 4 enotes changed from superseded issue as their 2djustable pins are removable A set screw and nylon plug locks the bottom pin in position and a sho lder nut of the time dial locks the top pin in position Attached to an insulated section of the disc shaft is a rigid arm holding a small silver hemisph...

Страница 2: ... generator characteristic at l per unit nega tive sequence current but at higher values of negative sequence current the relay charac teristic is substantially parallel and slight ly less than the generator characteristic In this manner a suitable margin of safety is obtained between the two characteristics Figure 2 defines the relay characteristics for two generators one with a permissible consta...

Страница 3: ...RACTERISTICS TIME DIAL 3 f SET J II 2 5 2 1 5 1 r i GENERATORS CHARACTERISTIC 12 2T 30 2 12 T 30 _ 1 t I 1 s 6 7 8 9 1 0 1 5 2 2 5 3 4 5 6 7 8 9 10 NEGATIVE SEQUENCE CURRENT IN PER UNIT 1 0 PER UNIT TAP VALUE CURRENT Fiq 2 Comparison 0 Relay Characteristic With Generator Characteristic 27 D 554 3 w w w E l e c t r i c a l P a r t M a n u a l s c o m ...

Страница 4: ...w w 1 z u w J cr 50 _j I u I I I v I 0 rr i 0 I cr 40 w z J w I l l lJ J I I 30 z I I I J I I 0 lL 0 w n 0 20 J 0 u f _j 0 1 0 10 z 0 w f 2 3 4 5 6 7 8 9 10 II TIME DIAL SETTING 27 D 5609 Fig 3 Tirne Dial Setting Versus Permissible Constant Of Generator 4 w w w E l e c t r i c a l P a r t M a n u a l s c o m ...

Страница 5: ...5 20 15 10 9 8 7 6 5 4 3 2 5 2 1 5 TIME DIAL SETTING 6 _ 1 l 1 l t I 5 6 7 8 9 1 0 1 5 2 2 5 3 4 5 6 7 8 9 10 NEGATIVE SEQUENCE CURRENT IN PER UNIT 1 0 PER UNIT TAP VALUE CURRENT Fig 4 Typical Operating Curves Of The COO Relay 27 D 5544 5 w w w E l e c t r i c a l P a r t M a n u a l s c o m ...

Страница 6: ...o be protected The time dial indicates a I T K curve of a generator for which the relay protects By turning the time dial the relay can be used to protect generators with I T constants varying from 30 to 90 as shown in Fig 3 ADJUSTMENTS AND MAINTENANCE All the relays should be inspected peri odically and the time of operation should be checked at least once every six months or at such other time i...

Страница 7: ...f the test connections is shown in Fig 6 Next adjust the spring tension until the relay will close contacts in 90 seconds with 5 2 ampe re s single per unit negative between terminals 8 phase tap value or one sequence current applied and 14 This adjustment is made by means of the spiral spring ad juster All spring convolutions must be free TRIP CIRCUIT Universal Trip This combination uses a 2 0 am...

Страница 8: ... RESPONSE TO ZERO SEQUENCE 27 D 5445 Fig 5 Diagram Of Test Connections Of The Type COO Relay For Adjusting Filter To Have No Response To Zero Sequence 8 ordering parts always give the complete name plate data ENERGY REQUIREMENTS The burdens of the type COQ Relay are as follows Watts Volt Amps Power Factor at 5 Amps at 5 Amps Angle 5 3 5 3 00 0 0 98 90 Lag 4 0 7 25 56 Lag TIMER STOPS 10 s i ER 3v o...

Страница 9: ... 0 92 TlltM tCKif w l U leQ 32 STVD FOR PI HEL LOCATION TM CK PANI L MTG FOR PRo JECTION ____ T fPE MTC 1 Olti J KR INT RNALSCH CUT OUT r Q SEHI FLUSH MOUNTING 0 rt2l j M TIC f Otl JEt r c GON_ T _ c rit c JTOUTl OR P1 0J CT ON MTC T IN PI NEI I PANEL I OCA1 0trrl FOR SEMI FW ot TVPE I m Fig 9 0utline And Drilling Plan Of The MlO Projection Or Semi Flush FT Flexitest Case 16 B 2477 9 w w w E l e c...

Страница 10: ...w w w E l e c t r i c a l P a r t M a n u a l s c o m ...

Страница 11: ...w w w E l e c t r i c a l P a r t M a n u a l s c o m ...

Страница 12: ...WESTINGHOUSE ELECTRIC CORPORATION METER DIVISION NEWARK N J Printed in U S A w w w E l e c t r i c a l P a r t M a n u a l s c o m ...

Отзывы: