![Westinghouse AC System Скачать руководство пользователя страница 11](http://html.mh-extra.com/html/westinghouse/ac-system/ac-system_installation-manual_965586011.webp)
Westinghouse Solar AC Installation Guide
Copyright © 2011 - Westinghouse Solar
7
|
P a g e
1.
Westinghouse Solar Roof Layout Site Surveys
Prepare for the roof layout by surveying your roof to gather the following design information:
A.
Roof type
. The most common roof type is composition asphalt shingle. Flat Concrete tile
and barrel tile roofs are also compatible with Westinghouse Solar AC panels. This
information will determine your specific roofing kit needed. We have included roof
attachment profiles that can be included in your plans in the appendix of this guide.
B.
Underlying structure
. Determine the dimension of rafters and the spacing of the rafters.
For example, 2"x 8" @ 24" o.c. describes 2" by 8" rafters that are spaced 24" on center.
This information will determine where you locate your attachment points on your roof
layout. Also, planning departments typically will not ask you to draw individual rafters on
your submitted layout, but they will need this information noted on the plans to confirm the
structure meets code requirements.
C.
Roof Pitch
. Measure the pitch of your roof in degrees.
D.
Roof measurements.
Take accurate measurements that can easily be transferred onto a
sheet of graph paper or into the CAD program you are working with to design the layout.
Remember to include any obstacles that will interfere with your array design. When
measuring the peak of the roof, exclude the roof cap in your measurements because this is
an unusable area for solar attachments.
E.
Azimuth
. This information will help you choose the optimal solar roof surfaces, and is also
crucial to include on documentation when applying for state rebates and incentives. Ideal
orientation is south, but east and west facing roofs are OK with only a slight output penalty.
Panels are designed for flush roof mounting at your existing roof slope.
F.
Shading.
Using a SunEye or Solar Pathfinder device, determine shading and design a layout
that will maximize system output.
2.
Drafting a Roof Layout
This portion of the process can be done using a graph paper or in a more detailed tool such as a
CAD program. Before submitting your layout to your local permitting jurisdiction, request
information from your local building permit office on special requirements for PV design in your
area. These requirements may include roof setbacks and clearances that need to be included in
your design.
Содержание AC System
Страница 1: ...Rev 10 12 11 AC System Installation Guide V2 60 Cell Modules ...
Страница 40: ...Westinghouse Solar AC Installation Guide Copyright 2011 Westinghouse Solar i P a g e Section VII Appendix ...
Страница 41: ...Westinghouse Solar AC Installation Guide Copyright 2011 Westinghouse Solar ii P a g e ...
Страница 42: ...Westinghouse Solar AC Installation Guide Copyright 2011 Westinghouse Solar iii P a g e ...
Страница 43: ...Westinghouse Solar AC Installation Guide Copyright 2011 Westinghouse Solar iv P a g e ...
Страница 44: ...Westinghouse Solar AC Installation Guide Copyright 2011 Westinghouse Solar v P a g e ...
Страница 45: ...Westinghouse Solar AC Installation Guide Copyright 2011 Westinghouse Solar vi P a g e ...
Страница 46: ...Westinghouse Solar AC Installation Guide Copyright 2011 Westinghouse Solar vii P a g e ...
Страница 47: ...Westinghouse Solar AC Installation Guide Copyright 2011 Westinghouse Solar viii P a g e ...
Страница 48: ...Westinghouse Solar AC Installation Guide Copyright 2011 Westinghouse Solar ix P a g e ...
Страница 54: ......