36
31031 R1
6
6.. O
Op
pe
erra
attiio
on
n
Before continuing, ensure you have completely read and understood this manual’s
Safety section, in addition to the safety information in the section(s) below.
6.1. Operation Safety
• Keep away from rotating and moving parts, including the auger flighting, drive components,
shafts, and bearings.
• Always operate with guards, covers, and shields in place.
• Have another trained person nearby who can shut down the equipment in case of accident.
• Keep the work area clear of bystanders.
• Keep the work area clean and free of debris.
• Ensure maintenance has been performed and is up to date.
6.2. Start-up and Break-in
Although there are no operational restrictions on the auger when used for the first time, it is recommended
that the following items be checked during the first hours of operation.
1. Check that the auger intake and discharge areas are free of obstructions.
Foreign objects can damage the auger. Remove any obstructions from the intake and
discharge areas before operating the auger.
2. Check the drive belt tension and alignment. See Maintenance Section for instructions.
3. Visually inspect the auger, see Visual Inspection in Maintenance Section.
4. Check tightness of all bolts/nuts, fasteners, and hardware (re-torque if necessary).
5. Ensure adequate power is supplied to operate the auger, see
Section 9. – Specifications on page 59
.
6. Start the auger and operate normally.
7. Be aware of unusual sounds. If any are heard, determine the source and stop the auger. Lock out and
correct the problem before resuming work. If your unsure of the problem or procedure, contact your local
dealer.
Note
The auger may run rough until the tube is polished.
8. Do not run the auger for long periods of time without material because it increases wear. Try to run only
when moving material.
9. Stop the auger when it is empty of grain and lockout power, lower fully.
Important
After the initial start-up and inspection, the auger should be shut down and visually inspected (see
Maintenance Section) after approximately ten hours of operation.
6. OPERATION
STX2 SERIES – PORTABLE GRAIN AUGER