background image

 

Leonardo Off-Grid 1kW/1500/24 GE-SL 

User Manual

 

 

EN

 

 
 

10 

 

LED STATUS warning table

 

LED STATUS 

GREEN LED: normal working status 

activated ON

LED STATUS 

no.1 flash of RED Led every 10 seconds: 

OVER-TEMPERATURE 

alarm status. 

LED STATUS 

No.2 RED LED flashes every 10 seconds: 

LOW-BATTERY

 alarm status. 

LED STATUS 

No.3 RED led flashes every 10 seconds: 

OVER-LOAD

 alarm status. 

Tab.4 STATUS LED signalling 

 

WARNING:  in  case  of  BLOCKED  inverter,  there  is  no  supply  voltage  at  the  output  AC-OUT,  because 
occurred one of the three fault conditions specified in the Tab.4, a RESTART of the device is necessary, by 
pressing the RESET button on the base of the device (Pic. 12). 

 

 

INSTALLATION AND WIRING 

a)

 

Install 

Leonardo Off-Grid 1kW/1500/24 GE

 in a dry and adequately ventilated place, fixed on a non-combustible 

surface and positioned in order to have a space free of obstacles of at least 10 cm around the device so to have 
the cooling by forced air convection. 
 

b)

 

Fix  the wall mounting bracket (supplied) using the provided plugs and screws; then fasten the inverter  through 
the hooked plate  on the upper part of the device. Finally secure the inverter to the wall using the holes at the 
bottom of the unit. As shown in Pic. 

11

 

Pic. 11 Wall Mounting 

 

 

c)

 

Connect in the following order:  

1.

 

positive  battery

 cable (See connection in the section 

Direct Current Side Protection

); 

2.

 

negative battery

 cable; 

3.

 

activate battery cut-off switch - ON position

;  

4.

 

connect

  PV  modules  PV1-PV2-PV3-PV4  (

verifying  the  polarity  of  each  pair  of  cables  that  have  to  be 

connected on the input inverter); 

HOOCKED PLATE

 

top 

of the inverter 

 

MOUNTING 

BRACKET 

 

PLATE 

bottom part 

of the inverter 

Содержание Leonardo Off-Grid 1kW-1500-24 MG

Страница 1: ...Leonardo Off Grid 1kW 1500 24 GE Manuale utente User manual IT EN...

Страница 2: ......

Страница 3: ...e l e e gia e ogata Collegando un gruppo elettrogeno all i g esso AC input il sistema garantisce la continuit di esercizio delle utenze senza percettibili discontinuit in caso di batteria scarica a ca...

Страница 4: ...contattare personale di manutenzione qualificato Assicurarsi che i cavi di collegamento siano dotati di fusibili e interruttori automatici Non sostituire mai un dispositivo di protezione con un compo...

Страница 5: ...ovabile sia insufficiente garantisce una continuit di servizio grazie al gruppo elett oge o ollegato all i g esso AC IN 5 un contatto pulito per l attivazione automatica pe ette l a e sio e del gruppo...

Страница 6: ...rno al Leonardo Off Grid provvede al controllo ed alla gestione del sistema inoltre fornisce una visualizzazione rapida dello stato di funzionamento del sistema Il Leonardo Data Logger esterno all app...

Страница 7: ...a 250W INVERTER DC AC Potenza continua 1500 VA Potenza di sovraccarico 1300W Ingresso AC Batteria 24Vdc DATA LOGGER OPZIONALE Energia prodotta Energia prelevata Indice di indipendenza energetica BANCO...

Страница 8: ...di protezione sul polo positivo inoltre l interruttore di sezionamento del polo positivo provvede all attivazione dell inverter in completa sicurezza ATTENZIONE gli accessori di montaggio del fusibil...

Страница 9: ...imale di tutta la potenza Tensione nominale batteria Caratteristiche moduli PV Batteria a 24V di tipo ermetico tensione di carica in fase di tensione costante ABSORPTION Vch 28 8V alla temperatura di...

Страница 10: ...di funzionamento Bypass Mode Fig 9 Segnalazione Bypass Mode Nel caso in Fig 9 i fatti possi ile ota e lo stato di fu zio a e to dell i ve te i odalit Bypass Mode il carico viene alimentato dal gruppo...

Страница 11: ...i 24V Potenza di uscita LOAD livello 3 la potenza elettrica delle utenze in uscita compresa in un intervallo di 2200W 4000W Stato di carica SOC livello 2 l energia effettivamente stoccata in batteria...

Страница 12: ...u di una superficie non infiammabile e posizionato in modo da lasciare uno spazio privo di ostacoli di almeno 10cm ell i to o del dispositivo he e pe ette il aff edda e to pe o vezio e fo zata dell a...

Страница 13: ...ta di tensione sul cavo in fase di funzionamento quindi una errata lettura della tensione di batteria La sezione dei cavi batteria di 25 mm2 Utilizzare il cavo in dotazione per effettuare il collegame...

Страница 14: ...kW 5000 48 GE 4kW e corrente massima 80A 48V per il modello 8kW 8000 48 GE 3 il dispositivo Leonardo Off Grid contemporaneamente carica la batteria ed alimenta le utenze al fine di ridurre al minimo i...

Страница 15: ...RTER spenti E tra bi i Led Bypass e Inverter spe ti P ovvede e a esetta e l i ve te esegue do la p o edu a o e da manuale Ad inve te spe to gi a e solo il sezio ato e DC delle atte ie e ve ifi a e l a...

Страница 16: ...Leonardo Off Grid 1kW 1500 24 SL Manuale utente IT 14 Schema Unifilare dell impianto trifase 4 5 kW Fig 14 Schema Unifilare dell impianto trifase 4 5Kw...

Страница 17: ...TER SLAVE L2 A Plug Sincronismo B Plug Sincronismo INVERTER SLAVE L3 A Plug Sincronismo B Plug Sincronismo INVERTER SLAVE L1 A Plug Sincronismo B Plug Sincronismo INVERTER SLAVE L2 A Plug Sincronismo...

Страница 18: ...Leonardo Off Grid 1kW 1500 24 Manuale utente IT 16 CARATTERISTICHE MECCANICHE E PESO Leonardo Off Grid 1kW 1500 24 GE 14 kg Fig 17 Caratteristiche meccaniche...

Страница 19: ...5 C Temperatura di esercizio Tamb 10 C 25 C 60 C 10 C 40 C 60 C 10 C 25 C 60 C 10 C 25 C 60 C PV CHARGER Min Tip Max Min Tip Max Min Tip Max Min Tip Max Tensione di batteria Vbatt 24 0V 48 0V 48 0V 48...

Страница 20: ...imperfetta installazione da manomissioni o interventi diversi dalle istruzioni da noi fornite La garanzia decade altres in caso di danni derivanti da trasporto e o cattiva conservazione del prodotto...

Страница 21: ...of the PV module always maximizing the energy delivered By connecting a genset to the input AC input the system ensures continuity of operation of the users without perceptible discontinuity in case...

Страница 22: ...evented from accidentally being put into operation again contact qualified maintenance personnel Ensure that the connection cables are provided with fuses and circuit breakers Never replace a protecti...

Страница 23: ...is insufficient it guarantees a continuity of service thanks to the genset connected to the AC IN input 5 a clean contact for automatic activation allows the switching on of the genset that manages t...

Страница 24: ...gy Manager inside the Leonardo Off Grid provides for the control and management of the system and also provides a quick view of the operating status of the system Leonardo Data Logger optional from th...

Страница 25: ...cells ex 250W power DC AC INVERTER Continuous Power 1500 VA 1300W overload power AC input 24Vdc Battery OPTIONAL DATA LOGGER Produced energy Drawn energy Index of Energy independence BATTERY BENCH 24...

Страница 26: ...ry bank is connected through a protective fuse to the positive pole and the positive pole disconnection switch ensures that the inverter is activated in complete safety ATTENTION the battery fuse moun...

Страница 27: ...re the best use of the whole power Nominal battery voltage Features of PV modules 24V hermetic battery charging voltage in constant voltage phase ABSORPTION Vch 28 8V at a temperature of 25 C 60 cells...

Страница 28: ...level of 40 then it switches to the operating mode Bypass Mode Pic 9 Bypass Mode signaling In the case in Pic 9 in fact it is possible to note the operating status of the inverter in mode Bypass Mode...

Страница 29: ...tage higher than 24V Output Power LOAD level 3 the output electric power of the consumptions is in a range of 2200W 4000W SOC charge status level 2 the actually stored energy in the battery is in an i...

Страница 30: ...GE in a dry and adequately ventilated place fixed on a non combustible surface and positioned in order to have a space free of obstacles of at least 10 cm around the device so to have the cooling by...

Страница 31: ...crease in the voltage drop on the cable during operation and therefore an incorrect reading of the battery voltage The battery cable section is 25 mm Use the supplied cable to make the connection to t...

Страница 32: ...000 48 GE 4kW and maximum current 80A 48V for model 8kW 8000 48 GE 3 the Leonardo Off Grid device simultaneously charges the battery and supplies the consumptions in order to reduce the genset set up...

Страница 33: ...are off Provide to reset the inverter performing the procedure in the manual When the inverter is turned off turn the DC switch of the batteries and check the starting of the BATTERY and INVERTER Led...

Страница 34: ...Leonardo Off Grid 1kW 1500 24 SL User manual EN 14 Single phase diagram of the 4 5kW three phase system Pic 14 Single line diagram of the 4 5Kw three phase system...

Страница 35: ...synchronism B Plug synchronism INVERTER SLAVE L3 A Plug synchronism B Plug synchronism INVERTER SLAVE L1 A Plug synchronism B Plug synchronism INVERTER SLAVE L2 A Plug synchronism B Plug synchronism I...

Страница 36: ...Leonardo Off Grid 1kW 1500 24 User Manual EN 16 MECHANICAL FEATURES AND WEIGHT Leonardo Off Grid 1kW 1500 24 GE 14 kg Pic 17 Mechanical features...

Страница 37: ...5 C 65 C 65 C Operating temperature Tamb 10 C 25 C 60 C 10 C 40 C 60 C 10 C 25 C 60 C 10 C 25 C 60 C PV CHARGER Min Typ Max Min Typ Max Min Typ Max Min Typ Max Battery Voltage Vbatt 24 0V 48 0V 48 0V...

Страница 38: ...omer imperfect installation by tampering or other interventions different by the instructions supplied by us The warranty is not valid also in case of damages coming from transport and or incorrect st...

Страница 39: ...i contenute nel presente documento sono vietati senza il consenso scritto di WESTERN CO Srl This document is the property of WESTERN CO Srl All rights are reserved Reproduction and use of information...

Страница 40: ......

Отзывы: