START UP AND TESTING THE SYSTEM 

As soon as the connections are made as in 

Pic.12

 it is necessary to start and test the system: 

1)

 

check  the  switching  on  of  the 

Leonardo  Off-Grid  1kW/1500/24  GE

  at  the  end  of  the  cable  connection  on  the 

battery terminals and activation of the battery isolation switch; 

2)

 

check the correct battery charge, otherwise check the correct installation of the battery bank; 

3)

 

check the activation of the AC-OUT output line; if a load is present, the inverter delivers power and the status is 
available from the LOAD light indications; 

4)

 

according  to  the  battery  charge  conditions,  the  presence  of  the  input  genset,  the  correct  operation  of  the 
inverter operating logic can be observed, as in 

Pic. 10. 

 

 

POSSIBLE PROBLEMS AND SOLUTIONS 

 

Led AC IN off

 

 Check the output voltage of the genset set and the wiring of the AC-IN connector. 

 

Absence  of  voltage  in  the  AC-OUT  output

 

  Check  the  wiring  of  the  AC-OUT  connector.  Check  whether  the 

Energy Manager has both BYPASS and INVERTER led off. 

 

Both  "

bypass

"  and  "

inverter

"  Led  are  off

 

  Provide  to  reset  the  inverter  performing  the  procedure  in  the 

manual.    When  the  inverter  is  turned  off,  turn  the  DC  switch  of  the  batteries  and  check  the  starting  of  the 
BATTERY  and  INVERTER  Led.  Verify  the  integrity  of  any  DC  protection  fuses.  If  the  problem  persists,  is 
recommended to contact Western CO technical support. 

 

Led PV CHARGE always off

 

 Check the wiring of photovoltaic strings.  

 

STATUS Led OFF

. Perform the reset of the inverter as in the manual. 

  

THREE-PHASE OR PARALLEL APPLICATIONS WITH SLAVE SL VERSION 

Leonardo Off-Grid 1kW/1500/24 GE, Master version for applications with network input,

 can be

 installed in a THREE-

PHASE or PARALLEL-type installation through the use of the code Leonardo Off-Grid 1kW/1500/24 SL, SLAVE version. 

Each installation includes 1 Master inverter and N type Slave inverters depending on the configuration. 
For example: 

Three-phase system

 tot. 

4,5Kw

 

Phase L1

 

 

no.1 Master

 - 

Phase L2

 

 

no.1 Slave

 - 

Phase L3

 

 

no.1 Slave 

 

 

 

 

 

 

 

 

 

 

Pic.13 Wiring Diagram Sync Control BUS for 4,5kW Three-phase System

 

 

 

INVERTER MASTER L1 

A - Plug Datalogger 
B - Plug synchronism 

INVERTER SLAVE L2 

A - Plug synchronism 
B - Plug synchronism 

 

INVERTER SLAVE L3 

A - Plug synchronism 
B - non connesso 

 

SYNC CABLE 

Patch Cable 8 pins 

 

DATALOGGER 
CABLE  
Patch Cable 
8 pins 

 

SYNC CABLE 

Patch Cable 8 pins 

 

Содержание Leonardo Off-Grid 1kW-1500-24 MG

Страница 1: ...Leonardo Off Grid 1kW 1500 24 GE Manuale utente User manual IT EN...

Страница 2: ......

Страница 3: ...e l e e gia e ogata Collegando un gruppo elettrogeno all i g esso AC input il sistema garantisce la continuit di esercizio delle utenze senza percettibili discontinuit in caso di batteria scarica a ca...

Страница 4: ...contattare personale di manutenzione qualificato Assicurarsi che i cavi di collegamento siano dotati di fusibili e interruttori automatici Non sostituire mai un dispositivo di protezione con un compo...

Страница 5: ...ovabile sia insufficiente garantisce una continuit di servizio grazie al gruppo elett oge o ollegato all i g esso AC IN 5 un contatto pulito per l attivazione automatica pe ette l a e sio e del gruppo...

Страница 6: ...rno al Leonardo Off Grid provvede al controllo ed alla gestione del sistema inoltre fornisce una visualizzazione rapida dello stato di funzionamento del sistema Il Leonardo Data Logger esterno all app...

Страница 7: ...a 250W INVERTER DC AC Potenza continua 1500 VA Potenza di sovraccarico 1300W Ingresso AC Batteria 24Vdc DATA LOGGER OPZIONALE Energia prodotta Energia prelevata Indice di indipendenza energetica BANCO...

Страница 8: ...di protezione sul polo positivo inoltre l interruttore di sezionamento del polo positivo provvede all attivazione dell inverter in completa sicurezza ATTENZIONE gli accessori di montaggio del fusibil...

Страница 9: ...imale di tutta la potenza Tensione nominale batteria Caratteristiche moduli PV Batteria a 24V di tipo ermetico tensione di carica in fase di tensione costante ABSORPTION Vch 28 8V alla temperatura di...

Страница 10: ...di funzionamento Bypass Mode Fig 9 Segnalazione Bypass Mode Nel caso in Fig 9 i fatti possi ile ota e lo stato di fu zio a e to dell i ve te i odalit Bypass Mode il carico viene alimentato dal gruppo...

Страница 11: ...i 24V Potenza di uscita LOAD livello 3 la potenza elettrica delle utenze in uscita compresa in un intervallo di 2200W 4000W Stato di carica SOC livello 2 l energia effettivamente stoccata in batteria...

Страница 12: ...u di una superficie non infiammabile e posizionato in modo da lasciare uno spazio privo di ostacoli di almeno 10cm ell i to o del dispositivo he e pe ette il aff edda e to pe o vezio e fo zata dell a...

Страница 13: ...ta di tensione sul cavo in fase di funzionamento quindi una errata lettura della tensione di batteria La sezione dei cavi batteria di 25 mm2 Utilizzare il cavo in dotazione per effettuare il collegame...

Страница 14: ...kW 5000 48 GE 4kW e corrente massima 80A 48V per il modello 8kW 8000 48 GE 3 il dispositivo Leonardo Off Grid contemporaneamente carica la batteria ed alimenta le utenze al fine di ridurre al minimo i...

Страница 15: ...RTER spenti E tra bi i Led Bypass e Inverter spe ti P ovvede e a esetta e l i ve te esegue do la p o edu a o e da manuale Ad inve te spe to gi a e solo il sezio ato e DC delle atte ie e ve ifi a e l a...

Страница 16: ...Leonardo Off Grid 1kW 1500 24 SL Manuale utente IT 14 Schema Unifilare dell impianto trifase 4 5 kW Fig 14 Schema Unifilare dell impianto trifase 4 5Kw...

Страница 17: ...TER SLAVE L2 A Plug Sincronismo B Plug Sincronismo INVERTER SLAVE L3 A Plug Sincronismo B Plug Sincronismo INVERTER SLAVE L1 A Plug Sincronismo B Plug Sincronismo INVERTER SLAVE L2 A Plug Sincronismo...

Страница 18: ...Leonardo Off Grid 1kW 1500 24 Manuale utente IT 16 CARATTERISTICHE MECCANICHE E PESO Leonardo Off Grid 1kW 1500 24 GE 14 kg Fig 17 Caratteristiche meccaniche...

Страница 19: ...5 C Temperatura di esercizio Tamb 10 C 25 C 60 C 10 C 40 C 60 C 10 C 25 C 60 C 10 C 25 C 60 C PV CHARGER Min Tip Max Min Tip Max Min Tip Max Min Tip Max Tensione di batteria Vbatt 24 0V 48 0V 48 0V 48...

Страница 20: ...imperfetta installazione da manomissioni o interventi diversi dalle istruzioni da noi fornite La garanzia decade altres in caso di danni derivanti da trasporto e o cattiva conservazione del prodotto...

Страница 21: ...of the PV module always maximizing the energy delivered By connecting a genset to the input AC input the system ensures continuity of operation of the users without perceptible discontinuity in case...

Страница 22: ...evented from accidentally being put into operation again contact qualified maintenance personnel Ensure that the connection cables are provided with fuses and circuit breakers Never replace a protecti...

Страница 23: ...is insufficient it guarantees a continuity of service thanks to the genset connected to the AC IN input 5 a clean contact for automatic activation allows the switching on of the genset that manages t...

Страница 24: ...gy Manager inside the Leonardo Off Grid provides for the control and management of the system and also provides a quick view of the operating status of the system Leonardo Data Logger optional from th...

Страница 25: ...cells ex 250W power DC AC INVERTER Continuous Power 1500 VA 1300W overload power AC input 24Vdc Battery OPTIONAL DATA LOGGER Produced energy Drawn energy Index of Energy independence BATTERY BENCH 24...

Страница 26: ...ry bank is connected through a protective fuse to the positive pole and the positive pole disconnection switch ensures that the inverter is activated in complete safety ATTENTION the battery fuse moun...

Страница 27: ...re the best use of the whole power Nominal battery voltage Features of PV modules 24V hermetic battery charging voltage in constant voltage phase ABSORPTION Vch 28 8V at a temperature of 25 C 60 cells...

Страница 28: ...level of 40 then it switches to the operating mode Bypass Mode Pic 9 Bypass Mode signaling In the case in Pic 9 in fact it is possible to note the operating status of the inverter in mode Bypass Mode...

Страница 29: ...tage higher than 24V Output Power LOAD level 3 the output electric power of the consumptions is in a range of 2200W 4000W SOC charge status level 2 the actually stored energy in the battery is in an i...

Страница 30: ...GE in a dry and adequately ventilated place fixed on a non combustible surface and positioned in order to have a space free of obstacles of at least 10 cm around the device so to have the cooling by...

Страница 31: ...crease in the voltage drop on the cable during operation and therefore an incorrect reading of the battery voltage The battery cable section is 25 mm Use the supplied cable to make the connection to t...

Страница 32: ...000 48 GE 4kW and maximum current 80A 48V for model 8kW 8000 48 GE 3 the Leonardo Off Grid device simultaneously charges the battery and supplies the consumptions in order to reduce the genset set up...

Страница 33: ...are off Provide to reset the inverter performing the procedure in the manual When the inverter is turned off turn the DC switch of the batteries and check the starting of the BATTERY and INVERTER Led...

Страница 34: ...Leonardo Off Grid 1kW 1500 24 SL User manual EN 14 Single phase diagram of the 4 5kW three phase system Pic 14 Single line diagram of the 4 5Kw three phase system...

Страница 35: ...synchronism B Plug synchronism INVERTER SLAVE L3 A Plug synchronism B Plug synchronism INVERTER SLAVE L1 A Plug synchronism B Plug synchronism INVERTER SLAVE L2 A Plug synchronism B Plug synchronism I...

Страница 36: ...Leonardo Off Grid 1kW 1500 24 User Manual EN 16 MECHANICAL FEATURES AND WEIGHT Leonardo Off Grid 1kW 1500 24 GE 14 kg Pic 17 Mechanical features...

Страница 37: ...5 C 65 C 65 C Operating temperature Tamb 10 C 25 C 60 C 10 C 40 C 60 C 10 C 25 C 60 C 10 C 25 C 60 C PV CHARGER Min Typ Max Min Typ Max Min Typ Max Min Typ Max Battery Voltage Vbatt 24 0V 48 0V 48 0V...

Страница 38: ...omer imperfect installation by tampering or other interventions different by the instructions supplied by us The warranty is not valid also in case of damages coming from transport and or incorrect st...

Страница 39: ...i contenute nel presente documento sono vietati senza il consenso scritto di WESTERN CO Srl This document is the property of WESTERN CO Srl All rights are reserved Reproduction and use of information...

Страница 40: ......

Отзывы: