Leonardo Off-Grid 1kW/1500/24 GE-SL
User Manual
EN
11
5.
connect
input
AC-IN
on AC Input connection through plug and play type RST AC connectors (if the genset is
present);
6.
connect
AC-OUT output
on AC Output connection via plug and play type RST AC connectors
7.
finally place the dedicated cable on the
temperature sensor of
the batteries in the vicinity of the same, for
a correct detection.
Since the device is equipped with a 1.5m length cable for battery connection it is absolutely recommended to install the
battery bank at a distance such as to maintain the original cable for the connection.
Increasing the distance with the battery bank causes an increase in the voltage drop on the cable during operation and
therefore an incorrect reading of the battery voltage.
The battery cable section is 25 mm².
Use the supplied cable to make the connection to the main battery terminals and in the case of a battery bank
consisting of several elements in series or in parallel use a cable with a minimum section of 50 mm² for wiring each
element in series or in parallel.
In case of installation of three-phase systems or several machines in parallel or of a battery bank made up of many
elements, it is absolutely recommended to install a copper bar for wiring the batteries.
It is recommended to install the device on a solid wall in a vertical position, in order to ensure adequate air circulation,
due to the forced ventilation of the device. For this reason it is to avoid also installation in dusty and dirty places.