AER
Slim
10
After carrying out condensate drain connections, pour at least 2 litres of water from a bottle into the tank
(slowly, in small quantities over a period of 5 minutes) and check for proper drainage.
6-INSTALLATION OF VALVE KIT (Accessory)
The valves supplied as a KIT must be assembled and integrated in the unit as shown in the figures of section 5.
Always place fiber or rubber flat gaskets between hydraulic parts (for example,
between a valve and a pipe or between a battery and a pipe).
Insulate all the pipes (upstream and downstream of the valve) and the valve body to
avoid condensate dripping out of the auxiliary tank.
Make sure that the actuator is facing up or horizontally with respect to the valve body.
Installations with the actuator facing down are not permitted.
The following pictures refer to left connection units (standard version SX). For right connection units (optional
version DX) the position of valve and pipes are mirrored.
2-WAY VALVE KIT ASSEMBLY
Содержание AER Slim Seriesl
Страница 1: ...thickness 119mm EVO Version...
Страница 2: ......
Страница 21: ...21...
Страница 23: ......
Страница 24: ...MIU AES GB 005 08 2019...