VHF-UHF Bi-Directional Amplifier Installation and Users Guide
Installation Guidelines: 4.5 Mounting and Grounding the ProtectLink BDA
WESTELL.COM
1-800-377-8766
Page 4-7
4.5 Mounting and Grounding the ProtectLink BDA
Follow the instructions in this section to mount the ProtectLink BDA on a wall.
Figure 4-1
Signal Booster Mounting brackets (circled)
1. Using the ProtectLink BDA as a template, mark the
eight (8) locations for the wall anchoring system screws
(four per mounting bracket). See
.
2. Move the ProtectLink BDA and drill the mounting
holes at the marks in the wall.
3. Install a wall anchor (8mm x100mm) in each of the eight (8) drilled holes.
4. Install the top two screws into the anchors, leaving enough room to slide the
screws into the keyholes near the top of each mounting bracket.
5. Once the Unit is hung on the top two screws, finish fastening the top screws.
6. Install the rest of the screws into the anchors, fastening the Unit to the wall.
7. Use 16 AWG or greater wire to connect the ground terminal shown in
above to a reliable earth ground.
Bottom view
Top view
Rear view
Ground
terminal
Wall anchors