User manual - English
User-manual-HighLine-v.02
01/2021
51
Tub
Water level sensor
Abb. 6.4: Setting of the ice cube height
6.4 Setting of the ice cube height
1.
Switch off the machine at the production switch (Position “Produktion aus/off”) and pull
the power plug. Remove the machine cover and the cover of the technical equipment box
(marked with a flash symbol).
2.
Release the fixing screw of the water level sensor.
3.
Change the position of the water
level sensor
Move upwards → longer ice cubes
Move downwards → shorter ice cubes
4.
Tighten the screw, insert the power
plug and switch on the machine (Position
“Produktion ein/on”) and monitor a
production cycle.
5.
Switch off the machine (Position
“Produktion aus/off”) and pull the power
plug once the required ice cube height is
reached. Replace the electrics box and
housing cover and tighten the screws.
Re-start the machine.
IMPORTANT:
At the maximum setting of the water level sensor, ensure that no water spills over the
edge of the trough during the production cycle (during trough movement).