7
14
5. Feed the Wire Harness (65) up into the bracket on one of
the Right Handrail and out of the large hole in the left
side. (Note: It may be helpful to use needlenose pliers to
pull the Wire Harness out of the hole.) Remove any plas-
tic ties from the bracket.
Insert the bracket on the Right Handrail (40) into the
upper end of the Right Upright (104). Attach the Handrail
with two 1” Bolts (43), two 1/4” Washers (44), two 1/4”
Star Washers (45), a 5/16” Washer (125), and a 4” Bolt
(117) as shown.
Do not tighten the Bolts yet.
See drawing 5a. Insert the included nylon tie through the
indicated hole in the Right Handrail (40).
See drawing 5b. Look into the Right Handrail (40) and
make sure that the Wire Harness (65) is secured to the
side shown. Tighten the nylon tie and cut the excess off
the end.
Attach the other Handrail (not shown) in the same way.
Note: There is not a wire harness on the left side.
65
43
44
104
125
45
43
44
45
40
117
Large
Hole
Bracket
5
4. Attach the Latch Housing (46) to the Left Upright (47)
with two 3/4” Screws (38). Make sure that the large hole
in the Latch Housing is on the side shown.
Remove the Latch Knob (48) from the Latch Pin (52).
Make sure that the Latch Pin Collar (49) and the Spring
(50) are on the Latch Pin. Insert the Latch Pin into the
Storage Latch (46), and then tighten the Latch Knob
back onto the Latch Pin.
46
38
52
50
47
Large Hole
48
49
4
3.
Open part bag B.
Hold an Upright Spacer (59) against
one side of the Frame (96) as shown. Insert a 3 1/2” Bolt
(54) into the indicated hole in the Upright Spacer and the
Frame. Next, tighten a 3/4” Tek Screw (9) into the
Upright Spacer and the Frame. Remove the 3 1/2” Bolt.
Repeat on the other side of the Frame.
Have a second person lift the front end of the Frame
(96). Insert a 3 1/2” Bolt (54) with a 3/8” Star Washer (55)
into the Right Upright (104) and the right Upright Spacer
(59), and tighten the Bolt into the Frame.
Do not over-
tighten the Bolt.
Repeat on the left side of the Frame.
55
96
Hole
54
104
3
HOW TO FOLD AND MOVE THE TREADMILL
HOW TO FOLD THE TREADMILL FOR STORAGE
Unplug the power cord. CAUTION: You must be able to
safely lift 20 kg (45 lbs.) to raise, lower, or move the tread-
mill.
1. Hold the treadmill with your hands in the locations shown at the
right.
To decrease the possibility of injury, bend your legs
and keep your back straight. As you raise the treadmill,
make sure to lift with your legs rather than your back.
Raise the treadmill about halfway to the vertical position.
2. Move your right hand to the position shown and hold the
treadmill firmly. Using your left hand, pull the latch knob to the
left and hold it. Raise the treadmill until the frame is past the
latch pin. Slowly release the latch knob.
Make sure that the
frame is securely held by the latch pin.
To protect the floor or carpet from damage, place a mat
under the treadmill. Keep the treadmill out of direct sun-
light. Do not leave the treadmill in the storage position in
temperatures above 30° C (85° F).
HOW TO MOVE THE TREADMILL
Before moving the treadmill, convert the treadmill to the storage
position as described above.
Make sure that the frame is se-
curely held by the latch pin.
1. Hold the upper ends of the handrails. Place one foot on the
base as shown.
2. Tilt the treadmill back until it rolls freely on the front wheels.
Carefully move the treadmill to the desired location.
To re-
duce the risk of injury, use extreme caution whilst mov-
ing the treadmill. Do not move the treadmill over an un-
even surface.
3. Place one foot on the base, and carefully lower the treadmill
until it is resting in the storage position.
Engaged
Frame
Latch
Knob
Latch Pin
Base
Front Wheels
9
59
5a
5b
Tie
Tie
65
40
40