![Werner & Weber MPC-A Скачать руководство пользователя страница 9](http://html.mh-extra.com/html/werner-and-weber/mpc-a/mpc-a_operation-manual_957248009.webp)
2.2.4 OPERATION PANEL
Control of the machine is via the operation panel, mounted next to the charging opening:
1...........The main switch serves for switching the
power supply on and off.
2.......... By pushing the start button, the compaction
process is started.
3.......... The machine may be switched off by pushing either
of the two EMERGENCY-OFF buttons on its lateral
faces. For restarting, both EMERGENCY-OFF
buttons must be unlocked.
4.......... The release switch serves for gradual opening
of the ram face in case of emergency.
5......... The power cable is connected to the socket
by means of a CEE-standard plug.
2.2.5. HYDRAULIC POWER PACK
The hydraulic power pack is located above the
charging opening and comes in closed design with
maintenance lid. The power pack serves for the control
and supply of the two hydraulic cylinders behind the
ram face.
The hydraulic unit consists of the following
components:
1 ......... motor with hydraulic pump
2 ......... control valve
3 ......... oil tank
4 ......... oil filler
5 ......... oil filter
6 ......... oil level gauge
7 ......... control cabinet
Page 08
issue january 2003
2
4
3
1
5
2
3
6
5
1
4
7
WERNER
WEBER
Содержание MPC-A
Страница 18: ...issue january 2003 Page 17 ANNEX DIMENSIONS Types MPC K and MPC L Type MPC A ...
Страница 26: ......
Страница 27: ......
Страница 28: ......