![Wenglor SB4-I Скачать руководство пользователя страница 28](http://html1.mh-extra.com/html/wenglor/sb4-i/sb4-i_operating-instructions-manual_956893028.webp)
EN
28
Light Array Operation
Schematic Diagram, Fix Blanking
8) Serial Communication
7) Timing
6) Cascading
5) Reduced Resolution
3) Fix Blanking
2) Contactor Monitoring
1) Restart Inhibit
8) Serial Communication
7) Timing
6) Cascading
5) Reduced Resolution
3) Fix Blanking
2) Contactor Monitoring
1) Restart Inhibit
88
2
89
Receiver
Control Panel
Emitter
Control Panel
Socket
Socket
Plug
Plug
Failure (RD)
Normal
Operation (GN)
Enter Button
Enter Button
Failure (RD)
Display 2
Display 1
Blanking
Alignment (YE)
OSSD off (RD)
OSSD on (GN)
Dip-Switch S1
2
1
3
4
4
2
6
1
3
5
7
8
24 V
0 V
Plug Receiver
Contactor Monitoring
Acknowledge
OSSD 1
24 V
Safety PLC
(Cat. 4; PL e; SIL3
or Safety-Relay
24 V
OSSD 2
0 V
Signal Output
Earth/Shield
0 V
Plug Emitter
Earth/Shield
Connector Pin Assignments for Safety Operation with Fix Blanking
Required system components:
1 × transmitter, 1 × receiver
1 × connector cable for transmitter
1 × connector cable for receiver
From
To
Transmitter Wiring
Pin 1
24 V DC
24 V DC supply voltage
Pin 2
Unused
Pin 3
0 V
0 V supply voltage
Pin 4
Earth/shield
Operational earth
Содержание SB4-I
Страница 50: ...EN 50 Dimensions and Weights 11 4 Mounting Bracket BEF SET 33...
Страница 55: ...55 Safety Light Array 14 Certification RoHS...
Страница 56: ...EN 56 EU Declaration of Conformity 15 EU Declaration of Conformity Subject to change without notice...
Страница 57: ...57 Safety Light Array...