Assembly / commissioning
06/2021
1026902-00
Operating instructions – 21/52
The assembly is the same process in reverse order.
–
Replace and close the cover.
–
Tighten the screw.
2.3
Commissioning
WARNING!
Damage to device possible!
Where there are great differences in temperature between
the transport route and the installation site the device may
not be put into operation immediately after being set up.
–
Wait at least 2 hours before connecting the device to
the power supply.
–
Run the cable with the SPA connectors through the opening provided for
this purpose in the frame.
–
Run the cable along the profile and then through the well.
See assembly instructions, section 5.2 “Cladding and assembly” for disas-
sembly of the cladding and mid-station cover.
–
Insert connectors in the mid-station:
ST2
X505
RJ45
Содержание SPA COMPLETE
Страница 2: ......
Страница 24: ...Assembly commissioning 22 52 Insert connectors in the control box ST9...
Страница 44: ...Technical data 42 52 6 2 Dimensions A1 70 mm A2 70 mm BK 2 450 mm TK 1 900 mm L 802 mm B 955 mm H 612 mm...
Страница 55: ......