SPECIFICATIONS
IOM-013
Page 3 of 18
CP2 & CP5GM
Rev: D
Last updated: 4/14/2011
1.
GENERAL
1.1 I
NTRODUCTION
We appreciate your business and your choice of Welker products. The installation,
operation and maintenance liability for this product becomes that of the purchaser at the
time of receipt. Reading the applicable
Installation, Operation and Maintenance (IOM)
Manual
prior to installation and operation of this equipment is required for a full
understanding of its application and performance prior to use.
If you have any questions, please call 1-800-776-7267 in the USA or 1-281-491-2331.
Notes, Cautions, and Warnings
Notes
emphasize information or set it off from the surrounding text.
Caution
messages appear before procedures that, if not observed, could
result in damage to equipment.
Warnings
are alerts to a specific procedure or practice that, if not
followed correctly, could cause personal injury.
*The following procedures have been written for use with standard Welker parts and equipment.
Assemblies that have been modified may have additional requirements and specifications that are not listed
in this manual.
1.2 D
ESCRIPTION OF
P
RODUCT
The Constant Pressure Sample Cylinder is
designed for use in systems where it is necessary to
extract and isolate accurate product samples by
maintaining a steady pressure from the pipeline to
the cylinder. The cylinders are equipped with a
magnetic indicator and a graduated scale set to
specify the capacity of the device.
During continuous sampling, when the magnetic
indicator reaches the 80% mark, all sampling
should be stopped. A pneumatic supply pre-
charges the cylinder with pressure to correspond
with pipeline pressure. Pre-charging allows the
sample to be transferred to the cylinder without