![Weishaupt WG20 1-C Z-LN Series Скачать руководство пользователя страница 21](http://html.mh-extra.com/html/weishaupt/wg20-1-c-z-ln-series/wg20-1-c-z-ln-series_manual_953344021.webp)
Installation and operating instruction
Gas burner WG40…/1-A ZM-LN
4 Installation
83300002 1/2019-02 La
21-128
4 Installation
4.1 Installation conditions
Burner type and capacity graph
Burner and heat exchanger must be matched.
Check burner type and burner capacity.
Installation location
Prior to installation ensure that:
sufficient space is available for normal and service position [ch. 3.4.7],
sufficient combustion air is available, if necessary install ducted air intake,
Prepare heat exchanger
The refractory
3
must not protrude beyond the front edge of the combustion head.
The refractory can take a conical shape (min 60°).
Refractory may not be required on boilers with water-cooled front, unless the man-
ufacturer gives other instructions.
Following installation, the aperture
4
between flame tube and refractory should be
filled with flame-proof, resilient insulating material. Do not make solid.
Heat exchangers with deep refractories or thick doors, or heat exchangers with re-
verse flame combustion chambers may require a combustion head extension. Head
extensions of 100, 200 and 300 mm are available. Dimension
2
then changes ac-
cording to the head extension used.
45°
60°
186 ... 200 mm
M10
160 mm
170
m
m
151 mm
1
4
3
2
1
Flange gasket
2
235 mm
3
Refractory
4
Aperture
Содержание WG20 1-C Z-LN Series
Страница 1: ...Installation and operating instruction Gas burner WG40 1 A ZM LN 83300002 1 2019 02 ...
Страница 105: ...Installation and operating instruction Gas burner WG40 1 A ZM LN 12 Project planning 83300002 1 2019 02 La 105 128 ...
Страница 124: ...Installation and operating instruction Gas burner WG40 1 A ZM LN 14 Notes 83300002 1 2019 02 La 124 128 14 Notes ...