Prepare boiler location
(continued)
Place the boiler:
Remove outer crate
1. Remove outer crate, leaving boiler on the crate base.
2. Remove the circulator and barometric damper cartons from the crate
base.
3. Remove the two (2) shipping channels by loosening and removing the
four nuts. Save the shipping channels for leveling leg installation.
4 . Remove the jacket cross tie fastened to the crate base.
Install the leveling legs if used (required if boiler is placed on
combustible fl ooring)
The leveling legs must be installed if the boiler is placed on
combustible fl ooring.
A second person, or other means, is required to stabilize the
boiler during leveling leg installation. Failure to do so could
result in severe personal injury or property damage.
Wear heavy leather work gloves when handling the shipping
channels in the following steps to avoid potential severe per-
sonal injury.
1. (Figure 2a) Use one channel as a lever to raise the front of the boiler.
2. (Figure 2a) Insert the other channel between the boiler leg and crate
base. Place the channel directly over the crate base runner, as shown.
3. (Figure 2b) Lift the channel under the boiler leg slightly.
4. (Figure 2b) Slide the other channel under the other boiler leg. Place the
channel directly over the crate base runner, as shown.
5. (Figure 3) With the boiler resting securely on the two (2) shipping
channels, screw a leveling leg in each boiler leg hole. Screw leveling legs
in completely.
To avoid potential personal injury or property damage, DO
NOT attempt to insert leveling legs unless the boiler is securely
seated on both shipping channels.
6. Reverse steps 2 through 4 above to remove the shipping channels. Leave
the boiler on the crate base.
7. Follow steps 2 through 6 on the back side of the boiler to install leveling
legs in the rear section legs.
8. Leave the boiler on the crate base.
Remove boiler from crate base
Boilers may be top heavy. Use caution when handling to avoid
personal injury or property damage.
1. Attach the cross tie to the jacket side panels using the two screws located
in the barometric damper carton. Then remove the boiler from the crate
base.
Do not remove the boiler from the crate base without fi rst
installing the jacket cross tie. The boiler wiring harnesses or
connectors could be damaged.
2. If necessary, the boiler jacket can be removed for handling. See pages 30
and 31 in this manual for the jacket removal/replacement procedure.
Figure 2a
To install leveling legs: Insert fi rst
shipping channel under boiler leg.
Figure 3
Inserting levelling legs
Figure 2b
To install leveling legs: Insert second
shipping channel under other leg.
Part number 550-142-182/1014
10