Gas-Fired Boiler — Boiler Manual
Part Number 550-141-186/0703
10
Assembly may start at either end section.
For easier assembly start with right end section.
1. Position right end section flush with right end of base. See
Figure 13
on page 15.
Section assembly
Figure 9
Sealing rope and seals
2b
Boiler assembly
—
—
—
—
—
sections
sections
sections
sections
sections
2. With caulking gun, apply
1
/
8
" continuous bead of sealing rope adhesive in sealing
grooves. See
Figure 9
.
3. Place ½" rope in groove. Around curves, grasp at 1" intervals and push together. Do
not stretch. Cut rope as each section is completed. See
Figure 9
.
4. Remove any grit from port opening sealing surfaces with clean rag. Note
Warning
below.
Clean port
sealing surfaces
Remove all grit or rust from port opening sealing surfaces. Failure to do
so may cause a seal failure, resulting in severe personal injury, death or
substantial property damage.
No petroleum-
based
chemicals
Do not use any cleaner containing petroleum-based distillate (oil).
Elastomer seal failure will occur, causing substantial property damage.
Do not precut
rope
Do not precut rope. Gas tight seal must be maintained to prevent possibility
of flue gas spillage and carbon monoxide emissions, causing personal
injury or death.
Sections are
top-heavy
Sections are top heavy and will not stand individually without support.
Severe personal injury, death or substantial property damage can result.
5. Place sealing rings in port openings. See
Figure 9
.
6. Prepare intermediate section:
a. Remove grit or rust from port opening sealing surfaces. Note
Warning
above.
b. Position intermediate sections so alignment lugs fit into sockets of next section.
Refer to
Figure 10
, page 11.