![Weil-McLain Evergreen EVG 110 Скачать руководство пользователя страница 26](http://html1.mh-extra.com/html/weil-mclain/evergreen-evg-110/evergreen-evg-110_manual_952699026.webp)
Vent termination requirements
Figure 24
The vent termination must be located to meet all requirements below (also applies to vertical vent terminations). The minimum distance from
adjacent public walkways, adjacent buildings, openable windows and building in the National Fuel Gas Code, ANSI Z223.1/NFPA 54 and/or
the Natural Gas and Propane Installation Code, CAN/CSA B149.1. The vent termination clearances below are for U.S.A., for Canadian vent
termination clearances please refer to the requirements of CAN/CSA B149.1 Natural Gas and Propane Installation Code. Consideration
should be given to avoid possible damage caused by vent plumes and condensate when choosing a venting confi guration and location.
Maintain a minimum clearance of 4 ft. (1.22m) horizontally from, and in no case above or below, unless a 4 ft. (1.22m) horizontal distance
is maintained, from electrical meters, gas meters, regulators, and relief equipment.
Part number 550-100-191/0917
26
®
g
as-fired water boiler —
70/110/155
Boiler Manual
Содержание Evergreen EVG 110
Страница 71: ...Part number 550 100 191 0917 71 gas fired water boiler 70 110 155 Boiler Manual Notes...
Страница 90: ...Part number 550 100 191 0917 90 gas fired water boiler 70 110 155 Boiler Manual Notes...
Страница 116: ...Part number 550 100 191 0917 116 gas fired water boiler 70 110 155 Boiler Manual Notes...