23
37
38
38. Hold a Pulley (69) in the slack in the High Cable
(44) as shown.
Have a second person orient the two Pulley
Plates (70) as shown.
Attach the Pulley (69) to the second hole from
the upper end of the Pulley Plates (70) with an
M10 x 43mm Bolt (65) and an M10 Locknut (74).
44
65
69
63
71
88
74
74
37. Hold a Pulley (69) under the High Cable (44) in
the location shown.
Attach the Pulley (69) and a Cable Trap (71)
to the Top Frame (6) with an M10 x 93mm Bolt
(63), an M10 Washer (88), and an M10 Locknut
(74).
Make sure that the Cable Trap is ori-
ented to hold the High Cable in the groove of
the Pulley.
Make sure to leave slack in the High Cable
(44) in the indicated location.
6
69
44
70
39
39. Route the Low Cable (43) under a Pulley (69).
Attach the Pulley (69), a Cable Trap (71), and
two Half Guards (72) to the Upright (5) with an
M10 x 97mm Bolt (100), an M10 Washer (88),
and an M10 Locknut (74).
Make sure that the
Cable Trap is oriented to hold the Low Cable
in the groove of the Pulley.
100
72
71
43
5
74
69
88
72
Slack
Содержание 831.14923.1
Страница 40: ...40 NOTES...