18
42. Wrap the Leg Lever Cable (70) under a 90mm
Pulley (39). Attach the Pulley and two Half Finger
Guards (42) to the Right Base (1) with an M10 x
48mm Bolt (101) and an M10 Nylon Locknut
(114).
43. Wrap the Leg Lever Cable (70) over a 90mm
Pulley (39). Attach the Pulley, a Small Cable Trap
(48), and two Half Finger Guards (42) at the sec-
ond hole from the bottom of the two Pulley Plates
(51) with an M10 x 52mm Bolt (102) and an M10
Nylon Locknut (114).
Make sure the Cable Trap
is oriented to hold the Cable in the groove of
the Pulley.
44. Wrap the Leg Lever Cable (70) under a 90mm
Pulley (39). Attach the Pulley and two Half Finger
Guards (42) to the “U”-bracket on the Right Base
(1) with an M10 x 48mm Bolt (101) and an M10
Nylon Locknut (114).
Make sure the Finger
Guards are on the outside of the “U”-bracket.
45. Wrap the Leg Lever Cable (70) under a 90mm
Pulley (39). Attach the Pulley, a Small Cable Trap
(48), and two Half Finger Guards (42) to the
bracket on the Right Base (1) with an M10 x
52mm Bolt (102) and an M10 Nylon Locknut
(114).
Make sure the Cable Trap is oriented to
hold the Cable in the groove of the Pulley, and
that the bracket is between the Pulley and the
Finger Guard next to the Locknut.
46. Route the Leg Lever Cable (70) up through the
Right Top Frame (7) and over a 90mm Pulley
(39). Attach the Pulley inside the Top Frame with
an M10 x 80mm Bolt (111), two M10 Washers
(116), two 19mm Spacers (77), and an M10
Nylon Locknut (114).
42
70
39
42
42
1
101
114
43
42
42
48
39
70
114
51
102
44
70
39
42
42
101
1
114
45
114
42
39
70
42
48
1
Bracket
102
46
70
116
116
111
114
77
77
39
7
Содержание Pro 8000
Страница 35: ...35 NOTES...