Installation and Connection
3
3-14 | UR11
NOTE!
The voltage must be compatible to the rectifier rated voltage. Refer to
item 3.4.6.4 Control Connections
for the configuration of the UR11 rated operation voltage.
The fastening of the UR11 output connections is done with four M12 x 25 bolts (tightening torque: 60 N.m.), as
presented at
. Refer to
item 3.4.2 Cables/Bus Bars on page 3-6
80
80
40
40
121
234
67
BARRAMENTO DE ENTRADA NEGATIVO (-UD)
BARRAMENTO DE ENTRADA POSITIVO (+UD)
Negative output bar (-UD)
Positive output bar (+UD)
121
[4.76]
234
[9.21]
67
[2.64]
40 [1.57]
80
[3.15]
40
[1.57]
80
[3.15]
Figure 3.14 -
UR11 output bus bar, DC connections (mm [in])
The input connections at the internal reactances are done by means of twelve M12 x 30 bolts (tightening torque:
60 N.m.), each reactor uses 6 bolts, 2 bolts per phase. The bus bars are of 40 x 10 mm (1.57 x 0.39 in) and
the fastening is done through M12 nuts inserted into the bar, as presented at
.
Содержание UR11 Series