115
APPENDIX
9
9.11 - RECOMMENDED APPLICATION WITH TERMINALS FOR THREE
WIRE CONTROL FOR SEVERAL MOTORS
Obs.:
It's necessary to use normal fuses or breaker to protect
the installation. Ultra-Fast fuses are not necessary for
the SSW-03 operation, but they are recommended for
SCR protection.
The transformer "T" is optional and must be utilized
when the line voltage is different than the electronics
and fan voltage.
OPTIONAL
EMERGENCY
STOP
START
PLUS