![Weco LV-HUB GEN-02 Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/weco/lv-hub-gen-02/lv-hub-gen-02_manual_949487018.webp)
LV-HUB V2.01 14/06/2022
Communication D Power Connection
4K4 PRO
*The cluster can be composed by 8 batteries in parallel, this diagram take 5 modules in parallel as example.
ATTENTION:
Each cluster must be equipped with an isolator to individually disconnect
(circuit breaker) the battery tower from the parallel bus bar in accordance with
local regulations.
Master Inverter
NEGATIVE POWER
CABLES
2X50/75mm²
POSITIVE POWER
CABLES
2X50/75mm²
PARALLEL BUS
BAR
CAN INPUT FROM
LAST CLUSTER
GROUND CABLES
10mm²
RS485 PARALLEL
RJ45 Cable
DATA COMM
CUSTER 01
CUSTER 02