STEP BY STEP PROCEDURE
Do not turn on the batteries until the entire system has been connected with the BUS BAR between modules and the Power cable is connected
to the common bus bar or to the inverter
1.
Stack all the modules in positions (Verify the load with a local civil engineer).
2.
Connect each module to GND and to the Master GND node.
3.
Assign each MASTER with a progressive ID via the PC software (max 5 Clusters).
4.
Connect the MASTER ID01, starting from the CAN-B PORT to the CAN-A PORT of MASTER ID02 and proceed up
to the last MASTER.
5.
Connect the LAST MASTER from the CAN-B PORT to the CAN INPUT PORT of the HUB.
6.
Connect the CAN-BMS PORT with the INVERT CAN PORT (follow the PIN OUT provided by the Inverter manufacturer
for CAN L CAN H).
7.
Set the cluster batteries DIP switch according to the parallel configuration. (*more detail checks the 4k4pro or 5K3 manual)
8.
Connect the RS485 from PORT B of the MASTER to the PORT A RS485 of the SUB1 and proceed in Daisy Chain up to
the last module.
9.
Turn ON the HUB Switch.
10.
Press the POWER BUTTON on all modules for 2-seconds to start the wake-up process on all SUB modules.
BATTERY SOFTWARE SET UP PROCEDURE
STEP 1, Upgrade all the batteries with the FW version 4.48
•
Access the Software and select the Low Voltage section, click on the FREE ACCESS button
•
Select the Battery image ``MODULE SETTING PROGRAM``
•
Set the COM port and Press CONNECT
•
Select SEARCH NEW FIRMWARE and LOAD the FW 4.48, the Press UPGRADE FIRMWARE
Repeat the same UPGRADE to all the batteries of each cluster