![Weco HeSU 5K3-LV HV Скачать руководство пользователя страница 53](http://html1.mh-extra.com/html/weco/hesu-5k3-lv-hv/hesu-5k3-lv-hv_manual_949484053.webp)
WeCo 5K3-LV-HV
HeSU 5K3-LV HV
Page 53 of 69
V_1.1_21-Nov-2020_LV-HV
3.5 Serial Battery Wiring Connections
ATTENTION
POWER CABLE CONNECTIONS MUST BE MADE IN STRICT ACCORDANCE WITH THE INSTRUCTIONS
IN THIS MANUAL. INCORRECT POWER CONNECTIONS CAN DAMAGE THE BATTERY AND CAUSE
INJURIES OR SERIUS DANGER AND DAMAGES
Attention
:
Screws, Cables and Bus Bar POWER CONNECTIONS must be installed with due diligence and the tightening of
the connection terminal must be to 40Nm. Each terminal should be inspected and its torque checked every 3 months
Attention:
All drawings are for reference only, always refer to the physical product as the standard. If the manual does
not match the physical product stop all actions, remove any connections and store the batteries in a safe place, call WeCo
product assistance for support
Attention:
Power cable connection For High current connection diagram please refer to the specific section, charging
current limitation is mandatory as per this manual instruction.
Attention:
do not use power cables and data cables not provided by WeCo
Содержание HeSU 5K3-LV HV
Страница 40: ...WeCo 5K3 LV HV HeSU 5K3 LV HV Page 40 of 69 V_1 1_21 Nov 2020_LV HV HUB power supply Line ...
Страница 47: ...WeCo 5K3 LV HV HeSU 5K3 LV HV Page 47 of 69 V_1 1_21 Nov 2020_LV HV 3 1 5 Personal protective equipment ...
Страница 65: ...WeCo 5K3 LV HV HeSU 5K3 LV HV Page 65 of 69 V_1 1_21 Nov 2020_LV HV 3 6 HV BOX ADDRESS ALL BATCHES ...