WeCo 5K3-LV-HV
HeSU 5K3-LV HV
Page 52 of 69
V_1.1_21-Nov-2020_LV-HV
3.4.1 Serial Tower Connection #1 Set Up of the HV box CAN Communication Loop
Three batteries connected in series is the minimum allowed configuration for High Voltage operation:
CAUTION
:
After setting the DIP switches the batteries must be restarted for the DIP switch changes to take effect
Power cables Connection
COMM cables connection
Содержание HeSU 5K3-LV HV
Страница 40: ...WeCo 5K3 LV HV HeSU 5K3 LV HV Page 40 of 69 V_1 1_21 Nov 2020_LV HV HUB power supply Line ...
Страница 47: ...WeCo 5K3 LV HV HeSU 5K3 LV HV Page 47 of 69 V_1 1_21 Nov 2020_LV HV 3 1 5 Personal protective equipment ...
Страница 65: ...WeCo 5K3 LV HV HeSU 5K3 LV HV Page 65 of 69 V_1 1_21 Nov 2020_LV HV 3 6 HV BOX ADDRESS ALL BATCHES ...