
WELD THE WORLD
Cod. 006.0001.1820
25/05/2018 V.2.6
Cruiser 322/402/502AC/DC
Power Pulse 322/402/502AC/DC
42
ENGLISH
2nd TIME
UP
DOWNL
POST GAS
WELDING
CURRENT
SLOPE
3rd TIME
SLOPE
FINAL
CURRENT
4Th TIME
STARTING CURRENT
1St TIME
LIFT
IGNITION
C.C.
CURRENT
- 4 HF
○ Bring the torch up to the work until the electrode tip is approximately 2 or 3 mm away.
○
Press (1T) and keep the torch trigger pressed.
○ The arc strikes without contact with the part and the voltage discharges (HF) cease automatically,
the welding current will assume the pilot current value. (if activated from the SET UP menu.)
○
Release (2T) the torch trigger.
○ The welding current reaches the pre-set value, by way of an up slope time, if programmed.
○ Press (3T) the trigger and keep it pressed to start the weld completion procedure.
○ The current reaches the end current value in the time set in the down slope time parameter.
○ The arc continues and the current output will be the value set in the end current parameter.
○ In these conditions the weld pool can be closed (crater filler current).
○ Release (4T) the trigger to extinguish the arc.
○ Gas delivery continues for the time set in the post gas parameter.
1St TIME
2nd TIME
RAMP
DOWN
POST GAS
PRE-GAS
WELDING
CURRENT
UP
3rd TIME
SLOPE
FINAL
CURRENT
4th TIME
HF
IGNITION
STARTING CURRENT
Antwerpsesteenweg 949 9041 Gent - Oostakker
[email protected]
www.welda.be
T
+32 (0)9 355 74 26
F
+32 (0)9 355 92 01