4
7) Place the ESV in the form work for concrete
pad, ensuring orientation, position and levels
are correct. Ensure all openings on ESV are
blanked off, including mounting plate hole.
8) Fit the nominated bolts through mounting
ƃDQJH(QVXUHVHYHUDOWKUHDGVIHHGWKURXJK
the plate and tape off top and bottom. Bolts are
inserted to protect threads off plate and need to
EHUHPRYHGIRUƂWWLQJLQVWDOODWLRQDIWHUVHWWLQJ
the ESV.
2ULHQWDWH(69DVUHTXLUHGDQGƂWHOHFWULFDO
connections/conduit.
5) For ESV6 please orientate planted root as
shown (base plate is parallel to the pathway).
For this installation, use 40 mm long M16 bolts
supplie.
Содержание LTM444
Страница 2: ...1 IP55 IK09 Class I ta 40 C Light column LTM440 FT LTM444 494 ...
Страница 5: ...4 ...
Страница 6: ...5 Cable connecting box EK70 ...
Страница 8: ...WE EF LEUCHTEN Installation and Maintenance Instructions Planted Root ESV4 ESV2 ESV6 ...