Brine Nebulization System, Type Soldos V3
Index: 03
Change date: 01/03/2017
Operating instructions no.: BA DW 005-03 Soldos V3 EN.docx
Page 14 of 70
4.3
Mechanical installation
Installing the brine dosing nozzle
The nozzle must be mounted on a higher level than the nebulization station with
the brine container in order to prevent the brine container from running empty!
A non-return valve must be installed in the dosing line when this is not possible.
A hole of approx. 40mm must be drilled through the cabin wall (see Figure) for
the installation of the nozzle part and the wall feed-through. The hole should have
a distance of 20-30cm to the cabin ceiling. The hole should be as far as possible
from the exhaust port. The best place is directly over the steam inlet opening. The
wall feed-through is included in the delivery scope and is glued into the hole in a
diffusion tight manner.
The
nozzle part
consist of a
nozzle cover with nebuliser nozzle and hose
connection
and is delivered as an assembled unit.
The
dosing line is made of PTFE 4x1mm
, is ducted from the outside of the room
through the wall feed-through and connected to the hose connector of the nozzle
part. The O-rings of the nozzle part are lightly greased with the grease supplied
Nozzle part
Wall feed-through
Figure6, Installation of nozzle part and wall feed-through
Nebulizer nozzle
Содержание Soldos V3
Страница 72: ......