![WCS Dumpsters FEL 4 Скачать руководство пользователя страница 9](http://html1.mh-extra.com/html/wcs/dumpsters-fel-4/dumpsters-fel-4_assembly-instructions-manual_878952009.webp)
9
Version 2: August 4, 2020
Step 11
–
Install front signage sheet and right and left fork protectors. This step requires 11 bolts/nuts. Two bolts on the
bottom left and right corners will go through the corner brackets and the signage sheet.
The signage panel should slip between the bottom rail and the vertical support rails. Tighten all bolts and nuts on the
three vertical support rails. the pivot bolts on each bottom corner, and all signage bolts. (16 bolts total).
Step 13
–
Remove the bottom nut from the outside bottom of the front and rear corner posts. Attach end bag support
rails for bag to the bottom of each front corner post over the bolts for the corner bracket. Bottom rails go inside of
corners on front corner posts.
Finger Tighten Only Need Photos Here.
Note
–
Top and Bottom end bottom bag rails are attached to the front of the unit first and after the bag is installed
are attached at the back of the unit.
Bottom Bag Support Rails are Flat.
2 Bolts go
Through
Corner Post
and Panel
2 Bolts go
Through
Fork
Protector,
Panel and
Corner
Post
Fork
Protector
Attach bottom bag
support rail to lower
bolt of corner post.