![WCS Dumpsters FEL 4 Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/wcs/dumpsters-fel-4/dumpsters-fel-4_assembly-instructions-manual_878952011.webp)
11
Version 2: August 4, 2020
Step 16 A
–
Install top rear bag support rod through end bag rail, corner post, bag sleeves, and vertical supports. Bag will
be taut. (If too tight to put end bag rail in place over rod, pull bag towards front of unit.) Tighten the front corner bolts of
the bag support rail.
Note: Insert Cotter Pins in the Ends of All Support Rods to Secure.
Step 17
–
Fold bag over front top rail and secure bag to front of unit. Slide bag support rod through front right corner
post, front bag sleeve, each vertical support rail and hole in left corner post. Insert cotter pin in end to secure
Step 18
- Put lids on top and insert rear lid support rod through right lid bracket through the first lid, then through the
middle lid support bracket, and finally through the second lid and the opposite corner lid bracket. Insert cotter pin in end
of lid support rail to secure.
These photos of the top back of the dumpster show the lid support rod going through the corner bracket, lid,
middle bracket, lid, and opposite bracket.