![WCS Dumpsters FEL 4 Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/wcs/dumpsters-fel-4/dumpsters-fel-4_assembly-instructions-manual_878952008.webp)
8
Version 2: August 4, 2020
Step 9A – Install front left and right L shaped brackets (picture of these below) in the top corners. For now, use
only the bottom bolt and nut on the end (show photo). The second one will be added to secure the top end bag bar.
Step 10
–
Attach center, left and right support rails to front rail forming a letter
“V”
using 6 bolts/nuts.
Finger Tighten
Bolts. Bolts will be tightened fully after the installation of the front signage panel in Step 11.
The outer Center support rails have a 45 degree angle on the end that goes on the bottom. Oval holes in front should be
vertical.
Leave this off
for now. It will
be used later.
Top L bracket installed
–
outside
view. Top bolt and nut left off for
now.
Dumpster with top rails and all vertical
support rails installed.