2. Connect
your Audit
or
Thr
ee-Phase Voltage
Connections
Use this configur
ation
when there ar
e multiple
phases present.
The
voltage
connections ar
e labelled P1, P2,
P3, N.
Connect voltage phases t
o P1, P2,
and P3. Connect
neutral t
o N.
Use thr
ee-phase wiring
tails if
they
wer
e pr
ovided
with
your Audit
or.
Single-Phase Voltage
Connections
Use this configur
ation
when one phase is pr
esent.
The
voltage
connections ar
e labelled P1, P2,
P3, N.
Connect P1, P2 & P3 t
o the same phase.
Connect neutral t
o N.
Use single-phase wiring tails if the
y w
ere pr
ovided
with your Audit
or.
Auditor A3R
Rogowski Coil
Version 1.0_September 2018