Installation Quick Look
Please follow 4 color tubing diagram to complete installation Please follow 4 color tubing diagram to complete installation
Installation needs to comply with State and local plumbing regulations.
HOW TO MAKE A CONNECTION
1. CUT THE TUBE SQUARE
Cut the tube square. It is essential that the outside diam-
eter be free from score marks and that burrs and sharp
edges be removed before inserting into fitting. For soft thin
walled plastic tubing we recommend the use of a tube
insert.
2. INSERT TUBE
Fitting grips before it seals. Ensure tube is pushed into the
tube stop.
3. PUSH UP TO TUBE STOP
Push the tube into the fitting, to the tube stop. The collet
(gripper) has stainless steel teeth which hold the tube
firmly in position while the o-ring provides a permanent
leak proof seal.
4. PULL TO CHECK SECURE
Pull on the tube to check that it is secure. It is a good
practice to test the system prior to leaving site and/or
before use.
Disconnecting PUSH COLLET AND REMOVE TUBE To
disconnect, ensure the system is depressurized before
removing the tube. Push in collet squarely against face of
fitting. With the collet held in this position, the tube can be
removed. The fitting can then be re-used.
CAUTION:
When cutting supplied tubes, predeter-mine the
length by measuring the distance between the components to
be connected.
No tools are needed to connect 4 colored tubes.
Connections
Item No.
Color of Tubing
Description
A
RO Faucet
FU-WDF-905-CP
Blue
Pure water to the Faucet
B
Feed Water Valve
F560080
Green
Feed Water to RO System
C
Tank Ball Valve
PPSV501222W
Yellow
Pure Water to Storage Tank
D
Drain Saddle
SC500B14 or WE-CU138B-Q Red
Discharge Water to Drain