7. Removing Protective Label & Plastic Cap
• Once concrete is cured, remove the protective label on top of the plastic top
assembly to expose the two recessed slots on each side to the bubble level.
• Loosen the three 10-24 screws.
• Adjustable pliers may be needed to break the plastic top assembly loose from
the concrete seal.
• Use the back of the pliers, or a hammer to tap against the plastic top assembly.
Removable Top
Assembly With
Bubble Level
Bubble Level
Recessed Slot
Recessed Slot
5. Plastic Top Assembly
Adjust the top of the drain with the plastic cover in place by screwing it into the drain body until
the top of the cover is flush with finish floor grade.
Plastic top assembly should sit tight against the clamping collar ensuring that no concrete seeps
into the drain assembly.
Make sure cover is snug but do not over tighten.
Pronto
6. Finish Floor
Finished floor slab should be poured flush with the top of the plastic leveling cap.
The floor surface may require hand finishing the concrete if the drain is above the
floor surface.
View After Concrete
Is Poured & Label
Is Removed
4