1. Leader Pipe
Leader pipe should be cut so that the height of the finished drain is at or just below the height of
the finished floor. The leader pipe should be cut evenly with no burrs or debris attached.
Note:
Pronto!™ floor drains arrive assembled and must be partially
disassembled before installation.
Plastic top assembly with bubble level should remain on the drain until drain is securely installed
and concrete cured. The plastic top assembly is designed to keep the nickel bronze grate from
being damaged during installation and keeps concrete from entering the drain.
Leader Pipe
Drain Body
Typical Installation
2
Plastic Top Assembly
w/Grate & Shank
Clamping Collar
Drain Body
Note:
Make sure cover is snug
but do not over tighten