The following outlines proper steps and precautions
for installing a ProMelt panel. All site preparations
are assumed to be completed before attempting an
installation. Refer to accompanying product literature
for specific information on panel components.
5-1/2 Feet
(Typical)
Drywall
Stud
Cleet Bracket
1/2
”
Lag Bolt with Washer
Welded Nut
Installation
!
WARNING
!
CAUTION
!
NOTICE
NO
T FOR
P
O
T A B L E U
S
E
lb
Mounting ProMelt Panels
Each ProMelt panel uses a Cleat Bracket to secure to
the wall. Cleats are designed to allow the ProMelt panel
to be safely lifted and secured in place.
1. Locate where the top of the panel needs to be.
This will correspond to the top of the Cleat Bracket.
2. Mount the Cleat Bracket using two 1/2" x 3-1/2" (min)
long lag bolts with the smaller 150 and 250 MBH Pro-
Melt panels and four with the larger 399 MBH panels.
Ensure the bracket is level on the wall and crosses
at least two studs (three for HX). Pre-drill each bolt
location with a 5/16" pilot hole. Additional bolts may
be used for further support.
Use washers when installing lag bolts to reduce the
risk of pull out.
Verify wall or related structural elements
are suitable to secure a ProMelt panel.
Failure to do so may result in the panel
falling off the wall or damaging nearby