Lync WQ-SF
SECTION 2: Installation and Operation
L- OMM-004_A
•
2/23/2022
Technical Support • (800) 433-5654 • Mon-Fri, 8 am - 5 pm EST
15
of
54
2.5.2 Network/communication Cable Connections
1. Use the provided shielded CAT5 Network/Communication cable(s).
2. Connect each unit in series (do not form a loop) from one communication port to the next
communication port.
WQSF-025-N and WQSF-050-N
Twin Alternating Operation
WQSF-075-N and WQSF-100-N
Progressive Flow Operation
Figure 2-4: Network Timer Configuration Wiring
2.5.3 Power Supply Connections
NOTE:
Power Supply includes a harness with 2 black wires that connect to circuit board, see Figure
2-6.
1. Insert black and black transformer wires into 24VDC input of control
Communication Cables
to P1 and P3 forms
Communication Cables
Wire Harness
Power Supply
Flow Meter Cable
to P5 port