LYNC UV-H
SECTION 7: MAINTENANCE
•
•
•
SECTION 7: MAINTENANCE
Disinfection of water will occur as long as the unit is properly maintained with genuine parts in
accordance with these instructions. Operating a malfunctioning unit or defeating any system sensors
may jeopardize the safety of the water. Online videos are available to help with typical maintenance
tasks. Simple tasks such as quartz inspections and lamp replacements can be done by end-user. More in-
depth activities such as quartz replacement, should be done by authorized service representatives.
Test Shutoff Valve Monthly
The optional solenoid shutoff valve should be tested monthly. Unplug valve from unit to confirm water
stops flowing. Plug the valve in again to confirm water continues to flow.
Clean Air Filter Periodically
The UV-H contains a washable air filter in the located at the air inlet port (See Figure 7.1). Periodically
check and clean the filter to ensure blower operation is not impeded.
Figure 7-1
UV Sensor Maintenance
Refer to document GH72 for maintaining the UV sensor.
Optional UVT & Flow Meter Maintenance
Refer to supplementary manual included with these devices.
7.1 Accessing the UV Chamber
The UV chamber can easily be opened for lamp replacement or quartz sleeve
inspection without having to drain the unit and without any tools.
CAUTION! Always shut down and unplug the unit before accessing the UV chamber.
1. Shutdown and unplug the unit then wait 5 minutes before opening the UV chamber to allow the
lamps to cool. The lamps heat up after use and can burn your skin if touched.
2. See Figure 7-2. Open the UV Chamber by undoing the over-the-center latch. Note where the latch
wire engages the extrusion feature
– it must be re-latched in same manner.
UV
UV
UV
Содержание LYNC UV-H
Страница 1: ...L OMM 016_A 6 22 2023...
Страница 33: ...LYNC UV H SECTION 7 MAINTENANCE Figure 7 9A...
Страница 34: ...LYNC UV H SECTION 7 MAINTENANCE Figure 7 9B...