SECTION 5: OPERATING INSTRUCTIONS
•
•
•
Typical message screens shown below:
Figure 5-2
5.3 Plugging in the UV-H for the first time
1. Ensure that all external wiring is complete (see section 4.5) and all the panels of the unit are closed
before connecting the power cord.
2. Plug female end of power cord into power entry module located on left side of the front panel. Plug
the male end of the power cord into a ground-fault circuit-interrupter (GFCI).
CAUTION! Avoid continuously starting and stopping the unit within a 24 hr period, as this will accelerate the
aging of the UV lamps and void warranty. See Product Specification Table for permissible lamp cycles.
CAUTION! There must be water in the treatment chamber to prevent damage to internal components.
In the event of a lack of water or water supply being turned off, shutdown the unit until the water
supply can be restored. In the event of a power failure, the unit will shut down and the optional
solenoid valve will close, preventing water from flowing. When the power returns, the unit will
automatically restart and perform a self-test. If no faults are detected, the unit will return to normal
operation and the optional solenoid valve will open. Note: even during a brownout, supply voltage
may drop low enough to shut down the unit. If the unit does not automatically restart as described
above, shutdown and unplug the unit and plug it in again.
3. Once the unit is plugged in, the LED illuminates, an audible tone is issued and the display becomes
active to confirm all three devices are functional. The unit then performs a self-diagnostic. Enter the
date of installation in the Settings Menu and treatment parameters, if required.