background image

 

 

Page 6 of 18 

HOT and/or COLD FEED WATER 

CONNECTION 

 Hard plumb Hot and/or Cold water 

 Connections into Blending Valve 

 Using (L) Copper Pipe. Refer to table 
 Below. Valve is marked with HOT 

 and Cold connections

 

 

 

 

 
 

 

 
 

 

 
 
 
 

 

 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

 

RO 

FEED WATER 

MIN/MAX 

PSIG 

PIPE 
SIZE 

FLOW 

RATE 

HS-450 

25/80 psig  ½” 

2 GPM 

HS-100 

25/80 psig  ½” 

4 GPM 

HS-2400 
 

 

25/80 psig  ½” 

8 GPM 

HS-4800  25/80 psig  1” 

12 GPM 

HS-9600 

 

25/80 psig  1 ¼” 

24  GPM 

HS-

15,000 

25/80 psig  1 ¼” 

24  GPM 

 

 

 

      

 

 

 

Inlet Connection 

NOTE:  Use only 
Teflon tape on all 

threaded pipe.

 

Recommend installing Ball Valves 

just prior to the Blending Valve. 

Содержание HS Series

Страница 1: ...Page 1 of 18 HS Series Reverse Osmosis Processor With Built in Pre treatment and Membrane Flush HS Series Pressure Tank Float Tank Models Installation Operation Maintenance Manual...

Страница 2: ...ing Watts HS Series Reverse Osmosis system read this manual completely Keep this manual available for future reference Further information is available by contacting your local Watts distributor Phone...

Страница 3: ...ion Membrane installation 5 Inlet Connection 6 Permeate Line Connection 7 Pressure Tank Connection 8 Atmospheric Storage Tank 9 Plumb to Drain 10 Operation Start Up 11 Alarms 12 Maintenance Quarterly...

Страница 4: ...ns 17 Grains 17 Grains 17 Grains 17 Grains 17 Grains MAX TDS 2500 PPM 2500 PPM 2500 PPM 2500 PPM 2500 PPM 2500 PPM MAX IRON 0 1 MGL 0 1 MGL 0 1 MGL 0 1 MGL 0 1 MGL 0 1 MGL MAX PSIG 80 80 80 80 80 80 M...

Страница 5: ...8 Membrane Installation Membrane Brine Seal Note All Membrane Vessels are clearly marked with flow direction Membrane Brine Seal is always facing the water entry to Vessel Flow Direction Marking Membr...

Страница 6: ...ked with HOT and Cold connections RO FEED WATER MIN MAX PSIG PIPE SIZE FLOW RATE HS 450 25 80 psig 2 GPM HS 100 25 80 psig 4 GPM HS 2400 25 80 psig 8 GPM HS 4800 25 80 psig 1 12 GPM HS 9600 25 80 psig...

Страница 7: ...ule 40 PVC HS15 000 1 MPT x 1 Female slip schedule 40 80 PVC Ball Valve used with Pressure Tank applications Note Fittings are included with systems ordered as complete packages only Permeate Line Con...

Страница 8: ...ipe is UNSUITABLE for any plumbing from RO Storage Tank Recommended materials include Braided Stainless Steel Tubing Hard Stainless Schedule 80 PVC or Poly Propylene is acceptable if not being connect...

Страница 9: ...Stainless Schedule 80 PVC or Poly Propylene if not being connected to boiler or heating system HS 450 3 8 HS 1000 3 8 HS 2400 3 8 HS 4800 3 4 HS 9600 3 4 HS 15 000 1 Plumb Drain Connection located on...

Страница 10: ...ponding electrical connection on the atmospheric tank 2 Connect the gray electrical cable from Control Box labeled By Pass Solenoid to the By Pass Solenoid 3 Connect the gray electrical cable from Con...

Страница 11: ...itch 1 to ON position The Water inlet solenoid valve will open There will be a 5 second delay before the pump starts The system may cycle on and off automatically during initial start up as air is pur...

Страница 12: ...tically be in Auto Bypass until the tank has completely filled The Auto by pass will only be triggered if the tank pressure drops below 5 psi Pressure tank systems Float switch controlled Atmospheric...

Страница 13: ...o the OFF position 4 Close Ball Valve on Permeate Line Connection on Bulkhead Pressure Tank Systems 5 Unplug unit from Power Supply 6 Place bucket under pre filters to catch the water from the filter...

Страница 14: ...ventive maintenance Include replacement of O Rings Replace RO membrane by loosen retaining clamp at top of stainless steel membrane vessel Carefully pry loose PVC end cap from stainless steel vessel P...

Страница 15: ...d PVC Vessel Cap with K Y Jelly or other water soluble lubricant Vaseline or other petroleum based lubricants will damage rubber o ring and cause leaks Insert new membrane into vessel with the Brine S...

Страница 16: ...ater pressure exceeds 80 psi a pressure regulator must be installed 4 Incoming water temperature cannot exceed 100 F 40 C This warranty does not cover any equipment that has been relocated from the si...

Страница 17: ...to transport concentrated waste water to a suitable drain Feed pressure Referring to the water pressure being supplied to the RO processor before it has entered the pre filter Raw water Feed pressure...

Страница 18: ...mi permeable membrane This process is called reverse osmosis because the pressure forces the water to flow in the reveres direction from the concentrated solution to the dilute solution to the flow di...

Отзывы: