background image

Setting the Sustaining Control

Step 1

Setting The Relief/Sustaining Control requires lowering the 
upstream pressure to the desired minimum sustained pressure.

Step 2

Leave the downstream isolation valve fully open and close the 
upstream isolation valve until the inlet pressure drops to the 
desired setting.

Step 3

Adjust the Relief/Sustaining Control screw IN, clockwise, until the 
inlet pressure begins to increase, or OUT, counterclockwise to 
decrease, stopping at the desired pressure (See Figure 4). 

Step 4

Allow pressure to stabilize.

Step 5

Fine-tune the relief/sustaining setting as required as detailed in 
Step 3.

Step 6

Open the upstream isolation valve to return to normal operation.

Clockwise to INCREASE 

inlet pressure

Counterclockwise to DECREASE 

inlet pressure

Figure 4 

PV20C — Pressure Sustaining Control

4          IOM-A-ACV-912_612   2115 

EDP# 1917034 

© 2021 Watts

IOM-A-ACV-912_612   2115 

EDP# 11917034 

© 2021 Watts         5

Содержание Ames 612GD

Страница 1: ...2 Setting the Pressure Reducing Control 3 Maintenance Schedule 6 Trouble Shooting Guide 6 Valve Disassembly Instructions 8 ACV Schematic 11 Local building or plumbing codes may require modifica tions...

Страница 2: ...ion flush line to remove debris 2 Install valve so the flow arrow matches flow through the line and gauges to monitor valve inlet and outlet pressures A Position Indicator can be installed to provide...

Страница 3: ...e does not include a bleed valve bleed air by loosen ing a fitting on the valve or a plug at the highest point of the valve assembly STEP 3 Pressure the line by opening the upstream isolation valve sl...

Страница 4: ...into the cover and restricted flow out of the cover of the main valve If recovery of pressure is slow upon increased downstream demand turn the adjustment screw OUT counterclockwise increasing the rat...

Страница 5: ...ief Sustaining Control screw IN clockwise until the inlet pressure begins to increase or OUT counterclockwise to decrease stopping at the desired pressure See Figure 4 Step 4 Allow pressure to stabili...

Страница 6: ...ve specification sheets for approximate cover capacity A continuous flow of water from the open port indicates a damaged diaphragm or loose disc diaphragm assembly Disassemble valve and replace diaphr...

Страница 7: ...embly by partially opening from full closed position Improperly configured opening speed control if equipped Adjust opening speed control to verify functionality adjust as required Standard setting fo...

Страница 8: ...Remove cover nuts and washers 3 Remove the cover If cover is not free to be removed loosen it by tapping upward along its outside edge with a dull cold chisel pic tured above a Large valves may requi...

Страница 9: ...e brush or by using a Mineral Dissolving Solution Inspect parts for wear and replace if necessary 7 Inspect valve seat If seat is not damaged removal is not necessary Valve seats 6 and smaller are thr...

Страница 10: ...Nuts in a crossing pattern to ensure even distribution Test the Disc and Diaphragm Assembly for smooth travel by following the Freedom of Movement Test procedure in previous section 11 Test the integ...

Страница 11: ...Stem Washer ASTM A276 304 Stainless Steel 10 Diaphragm Washer ASTM A536 65 45 12 Epoxy Coated Ductile Iron 11 Diaphragm Buna N Nitrile 12 Disc Retainer ASTM A536 65 45 12 Epoxy Coated Ductile Iron 13...

Страница 12: ...sts resulting from labor charges delays vandalism negligence fouling caused by foreign material damage from adverse water conditions chemical or any other circumstances over which the Company has no c...

Отзывы: