background image

Benchmark Platinum-Edge [ii]: Installation Manual

 

FORWARD 

 

OMM-

136_G    •    GF-210   •    8/20/2020          Technical Support • (800) 526-0288 • Mon-Fri, 8 am - 5 pm EST          Page 

5

  of 

62

 

 

FOREWORD 

The  AERCO  Benchmark  (BMK)  750  through  6000  natural  gas  and  propane  fueled  boilers  are 
modulating and condensing units. They represent a true industry advance that meets the needs 
of  today's  energy  and  environmental  concerns.  Designed  for  application  in  any  closed  loop 
hydronic  system,  the  Benchmark's  modulating  capability  relates  energy  input  directly  to 
fluctuating  system  loads.  These  BMK  models  provide  extremely  high  efficiency  operation  and 
are ideally suited for modern low temperature, as well as, conventional heating systems.  

IMPORTANT! 

Unless otherwise specified:  

  All descriptions in this document apply to the Benchmark Platinum Series of boiler. 

  All measurements apply to both natural gas and propane models. 

The Benchmark models operate within the input and output ranges listed below.  

 

Benchmark Platinum Boiler Intake and Output Ranges 

MODEL 

INPUT RANGE (BTU/HR.) 

OUTPUT RANGE (BTU/HR.) 

MINIMUM 

MAXIMUM 

MINIMUM 

MAXIMUM 

BMK750 

50,000 (14.6 kW) 

750,000 (220 kW) 

47,750 (14.0 kW) 

716,250 (210 kW) 

BMK1000 

50,000 (14.6 kW) 

1,000,000 (293 kW) 

48,300 (14.2 kW) 

968,000 (284 kW) 

BMK1500 

75,000 (22 kW) 

1,500,000 (440 kW) 

64,500 (18.9 kW) 

1,395,000 (409 kW) 

BMK2000 

100,000 (29.3 kW)  2,000,000 (586 kW) 

86,000 (25.2 kW) 

1,860,000 (545 kW) 

BMK2500 

167,000 (48.9 kW)  2,500,000 (732 kW) 

144,000 (42.2 kW)  2,395,000 (702 kW) 

BMK3000 

200,000 (58.6 kW)  3,000,000 (879 kW) 

174,000 (51.0 kW)  2,874,000 (842 kW) 

BMK4000 

267,000 (78.2 kW)  4,000,000 (1172 kW) 

232,000 (68.0 kW)  3,800,000 (1113 kW) 

BMK5000N 

250,000 (73.3 kW)  4,990,000 (1462 kW) 

218,000 (63.9 kW)  4,740,000 (1389 Kw) 

BMK5000 

400,000 (117 kW) 

5,000,000 (1465 kW) 

348,000 (102 kW) 

4,750,000 (1392 kW) 

BMK6000 

400,000 (117 kW) 

6,000,000 (1758 kW) 

348,000 (102 kW) 

5,700,000 (1670 kW) 

The  output  of  the  boiler  is  a  function  of  the  unit’s  firing  rate  (valve  position)  and  return  water 
temperature. 

When  installed  and  operated  in  accordance  with  this  Instruction  Manual,  the  BMK750 

–  2000 

and 5000 & 6000 comply with the NO

x

 emission standards outlined in: 

South Coast Air Quality 

Management District (SCAQMD), Rule 1146.2

. In addition, the BMK2500 

– 6000 comply with 

the 

Bay Area Air Quality Management District regulation 9, Rule 7

Whether used in singular or modular arrangements, the BMK boilers offer the maximum venting 
flexibility  with  minimum  installation  space  requirements.  These  boilers  are  Category  II  and  IV, 
positive pressure appliances. Single and/or multiple breeched units are capable of operation in 
the following vent configurations: 

 

Room Combustion Air: 

o

  Vertical Discharge 

o

  Horizontal Discharge 

 

Ducted Combustion Air: 

o

  Vertical Discharge 

o

  Horizontal Discharge 

Содержание AERCO Benchmark BMK4000

Страница 1: ...0 Boiler Application Guide TAG 0022 GF 2050 Vent Combustion Air Guide TAG 0047 GF 2030 Benchmark Gas Guide TAG 0048 GF 2060 Benchmark Power Guide Applies to serial numbers G 20 1800 and above BMK750 5...

Страница 2: ...6 SUPPLY AND RETURN PIPING 23 2 6 1 BMK750 1000 Supply and Return Piping 23 2 6 2 BMK1500 5000N Supply and Return Piping 23 2 6 3 BMK5000 6000 Supply and Return Piping 25 2 6 4 Dual Inlet Return Pipin...

Страница 3: ...8 20 2020 Technical Support 800 526 0288 Mon Fri 8 am 5 pm EST Page 3 of 62 3 1 INTRODUCTION 47 3 1 1 Connecting the Ethernet Cable 47 3 1 2 Confirming the Ethernet Connection 48 3 1 3 Confirm Etherne...

Страница 4: ...Benchmark Platinum Edge ii Installation Manual CONTENTS OMM 136_G GF 210 8 20 2020 Technical Support 800 526 0288 Mon Fri 8 am 5 pm EST Page 4 of 62 This page intentionally blank...

Страница 5: ...00 440 kW 64 500 18 9 kW 1 395 000 409 kW BMK2000 100 000 29 3 kW 2 000 000 586 kW 86 000 25 2 kW 1 860 000 545 kW BMK2500 167 000 48 9 kW 2 500 000 732 kW 144 000 42 2 kW 2 395 000 702 kW BMK3000 200...

Страница 6: ...imply the number of distinct symbol changes signaling events transmitted per second It is not equal to bits per second unless each symbol is 1 bit long BMK Benchmark AERCO s Benchmark series boilers B...

Страница 7: ...ut Output I O Box Input Output I O Box currently used on Benchmark boilers IP Internet Protocol ISO International Organization for Standardization Lbs Pounds 1 lb 0 45 kg LED Light Emitting Diode LN L...

Страница 8: ...data based on the RS232 Standard RS485 or EIA 485 A standard for serial half duplex HDX transmission of data based on the RS485 Standard RTN Rtn Return SETPT Setpt Setpoint Temperature SHLD Shld Shie...

Страница 9: ...matches candles flames or other sources of ignition to check for gas leaks Fluids under pressure may cause injury to personnel or damage to equipment when released Be sure to shut off all incoming an...

Страница 10: ...remote shutdown switch or circuit breaker marked for easy identification at a location readily accessible in the event of boiler mis operation Design the system so activation of the emergency shutdown...

Страница 11: ...the floor level where the gas equipment is to be installed In addition the installing plumber or gasfitter shall observe that a battery operated or hard wired carbon monoxide detector with an alarm i...

Страница 12: ...venting system components with the equipment the instructions provided by the manufacturer for installation of the equipment and the venting system shall include 1 Detailed instructions for the insta...

Страница 13: ...pping container the unit must be moved by pallet jack or forklift from the front only NOTE AERCO is not responsible for lost or damaged freight Each unit has A Tip N Tell indicator on the outside of t...

Страница 14: ...quired by AERCO are listed below for all models However if Local Building Codes require additional clearances these codes shall supersede AERCO s requirements The minimum acceptable clearances require...

Страница 15: ...nical Support 800 526 0288 Mon Fri 8 am 5 pm EST Page 15 of 62 Figure 2 1a BMK750 1000 Clearances Figure 2 1b BMK1500 2000 Clearances NOTE Ensure that condensate assembly is not located over the house...

Страница 16: ...t 800 526 0288 Mon Fri 8 am 5 pm EST Page 16 of 62 Figure 2 1c BMK2500 3000 Clearances Figure 2 1d BMK4000 5000N Clearances Housekeeping Pad NOTE Ensure that condensate assembly is not located over th...

Страница 17: ...nd flammable vapors or liquids FOR MASSACHUSETTS ONLY For Massachusetts installations the unit must be installed by a plumber or gas fitter licensed within the Commonwealth of Massachusetts In additio...

Страница 18: ...nstallation Manual SECTION 2 INSTALLATION OMM 136_G GF 210 8 20 2020 Technical Support 800 526 0288 Mon Fri 8 am 5 pm EST Page 18 of 62 Figure 2 2a BMK750 1000 Anchor Bolt Locations Figure 2 2b BMK150...

Страница 19: ...NSTALLATION OMM 136_G GF 210 8 20 2020 Technical Support 800 526 0288 Mon Fri 8 am 5 pm EST Page 19 of 62 Figure 2 2c BMK2500 3000 Anchor Bolt Locations Figure 2 2d BMK4000 5000N Anchor Bolt Locations...

Страница 20: ...k 1500 to 6000 4 to 8 inches 10 2 to 20 3 cm If you are using the AERCO Condensate Neutralizer Tank P N 89030 you must ensure enough height for the condensate to drain into the condensate trap then in...

Страница 21: ...low WARNING When using the lifting tab and bar ensure there is no load placed on the gas train or blower Attaching the Lifting Bar BMK750 1000 Instructions 1 Remove the lifting bar from its shipping l...

Страница 22: ...o 2 lifting lugs are provided at the top of the primary heat exchanger see Figure 2 3c The location of the lifting tabs is marked on the shrink wrap coving the unit for shipping Remove the four 4 lag...

Страница 23: ...on the rear of the unit as shown in Figure 2 4a Figure 2 4a BMK750 1000 Supply and Return Locations 2 6 2 BMK1500 5000N Supply and Return Piping Benchmark 1500 3000 units have the following inlets and...

Страница 24: ...owing gas inlet pipes o 3 7 62 cm Natural Gas inlet pipe o 1 5 3 81 cm Propane inlet pipe 10 25 4 cm Air Inlet adapter Figure 2 4b BMK1500 5000N Supply and Return Locations CONDENSATE DRAIN HOT WATER...

Страница 25: ...urn temperature zone or AERCO SmartPlate thermal efficiency can improve by up to 6 based on an 80 F 26 7 C minimum return water temperature at full fire Lower return temperatures are possible which wo...

Страница 26: ...used on the threaded connections Any excess should be wiped off to avoid getting any joint compound into the valve body The relief valve must be piped to within 12 inches 30 5 cm of the floor to prev...

Страница 27: ...a union be utilized between the exhaust manifold condensate drain port and the trap inlet port If the condensate trap does not connect directly to the exhaust manifold condensate drain port the pipe b...

Страница 28: ...OBE PORT 3 4 NPT NIPPLE HOSE CLAMP CONDENSATE TRAP P N 24441 1 DIAM HOSE 3 4 NPT NIPPLES UNION EXHAUST MANIFOLD TO CONDENSATE NEUTRALIZER TRAP INLET INTEGRAL ADAPTOR AND THUMBSCREW TOP COVER THUMB SCR...

Страница 29: ...f unit 3 inch 7 62 cm LGP in back of unit 1 1 2 inch 3 81 cm on top of unit Prior to installation all pipes should be de burred and internally cleared of any scale metal chips or other foreign particl...

Страница 30: ...rmation On all Benchmark models it is strongly recommended that the pressure regulator be installed a minimum distance of 10 pipe diameters between the pressure regulator and the nearest downstream fi...

Страница 31: ...7c BMK1500 5000N Gas Regulator and Manual Shut Off Valve Dual Fuel GAS INLET GAS PRESSURE REGULATOR MANUAL SHUT OFF VALVE NATURAL GAS INLET NATURAL GAS INLET NATURAL GAS PRESSURE REGULATOR PROPANE MA...

Страница 32: ...ply regulator must be positioned as shown in Figure 2 7a 2 7d The gas supply regulator must be properly vented to outdoors Consult the local gas utility for detailed requirements concerning venting of...

Страница 33: ...z 20 BMK2500 3000 Domestic 208 V 3 60 Hz 20 460 V 3 60 Hz 15 BMK2500 3000 International 380 415 V 3 50 60 Hz 15 BMK4000 5000N Domestic 208V 3 60 Hz 40 480V 3 60 Hz 20 BMK5000 6000 Domestic 208 V 3 60...

Страница 34: ...urce is used the installed boiler must be electrically bonded to ground in accordance with the requirements of the authority having jurisdiction In the absence of such requirements the installation sh...

Страница 35: ...ny unit covers inhibit service maintenance or prevent access between the unit and walls or another unit 2 11 FIELD CONTROL WIRING I O Board Each unit is fully wired from the factory with an internal o...

Страница 36: ...ximum gauge of wires connecting to the I O board is 14 J24 SPARK MONITOR FROM SHELL HARNESS 63216 2 CONNECTOR J9 I O BOARD POWER HARNESS 63232 CONNECTOR J24 VALVE HARNESS INTERLOCK FROM SHELL HARNESS...

Страница 37: ...riable Primary application Secondary Loop in a Primary Secondary application Loop 1 in a Multi application Typically used on Manager and Backup Manager units For more information refer to the Benchmar...

Страница 38: ...rtPlate Valve input Swing V1 feedback Swing V2 Feedback VS Pump Feedback Variable Speed Pump Feedback Remote Setpoint 2 DHW VSP Fdbk To assign program its function go to the Controller s Main Menu Adv...

Страница 39: ...r To assign program its function go to the Controller s Main Menu Advanced Setup Ancillary Devices Relays then set the Relay to Spare 2 Relay and the Name to one of the above devices 2 Spare 2 Relay C...

Страница 40: ...es the flue must be pitched back towards the unit a minimum of 1 4 per foot 0 64 cm per 0 3 m to avoid any condensate pooling and to allow for proper drainage While there is a positive flue pressure d...

Страница 41: ...free area must take into account restrictions such as louvers and bird screens For Canada installations refer to the requirements specified in CSA B149 1 10 sections 8 4 1 and 8 4 3 2 13 1 DUCTED COM...

Страница 42: ...onsists of installing the sequencing isolation valve in the hot water outlet pipe and then connecting it to the pre wired connector on the shell harness as described below NOTE The Sequencing Isolatio...

Страница 43: ...Signal 1236 Black 24V Common 1237 Red 24V Hot 1238 White Valve analog input 1239 Green Valve analog feedback 1240 Black Delayed interlock 1241 Black 3 Remove and dispose of the cap with jumper wire at...

Страница 44: ...chmark Platinum s power panel includes a secondary output board with a pump relay that is designed to operate a boiler pump This relay provides 120VAC with a maximum pilot duty of 3 amps If the pump p...

Страница 45: ...led per the instructions above the next steps are Optionally implement the onAER option which allows your unit to be monitored remotely To implement this option complete the instructions in the next s...

Страница 46: ...Benchmark Platinum Edge ii Installation Manual SECTION 2 INSTALLATION OMM 136_G GF 210 8 20 2020 Technical Support 800 526 0288 Mon Fri 8 am 5 pm EST Page 46 of 62 This page intentionally blank...

Страница 47: ...ctions below provide instructions for implementing only the first option enabling communication through an Ethernet cable connected to the site s network If you ordered a Benchmark Platinum boiler wit...

Страница 48: ...thernet Connection Refer to Figure 3 2 below and complete the following instructions to confirm that the Ethernet cable connection is working Confirming the Ethernet Connection Instructions 1 Powered...

Страница 49: ...t DHCP Configuration Instructions 1 Connect your computer to the network jack that will be used by the Edge Controller Your computer should be configured to automatically get a network address Boot or...

Страница 50: ...Benchmark Platinum Edge ii Installation Manual SECTION 3 ONAER SETUP OMM 136_G GF 210 8 20 2020 Technical Support 800 526 0288 Mon Fri 8 am 5 pm EST Page 50 of 62 This page intentionally blank...

Страница 51: ...nual APPENDIX A DIMENSIONAL AND CLEARANCE DRAWINGS OMM 136_G GF 210 8 20 2020 Technical Support 800 526 0288 Mon Fri 8 am 5 pm EST Page 51 of 62 Appendix A Dimensional and Clearance Drawings Benchmark...

Страница 52: ...i Installation Manual APPENDIX A DIMENSIONAL AND CLEARANCE DRAWINGS OMM 136_G GF 210 8 20 2020 Technical Support 800 526 0288 Mon Fri 8 am 5 pm EST Page 52 of 62 Benchmark 750 1000 Single Unit Clearan...

Страница 53: ...ii Installation Manual APPENDIX A DIMENSIONAL AND CLEARANCE DRAWINGS OMM 136_G GF 210 8 20 2020 Technical Support 800 526 0288 Mon Fri 8 am 5 pm EST Page 53 of 62 Benchmark 750 1000 Zero Side Clearanc...

Страница 54: ...ii Installation Manual APPENDIX A DIMENSIONAL AND CLEARANCE DRAWINGS OMM 136_G GF 210 8 20 2020 Technical Support 800 526 0288 Mon Fri 8 am 5 pm EST Page 54 of 62 Benchmark 1500 2000 Dimension Drawing...

Страница 55: ...ii Installation Manual APPENDIX A DIMENSIONAL AND CLEARANCE DRAWINGS OMM 136_G GF 210 8 20 2020 Technical Support 800 526 0288 Mon Fri 8 am 5 pm EST Page 55 of 62 Benchmark 1500 2000 Clearance Drawin...

Страница 56: ...ii Installation Manual APPENDIX A DIMENSIONAL AND CLEARANCE DRAWINGS OMM 136_G GF 210 8 20 2020 Technical Support 800 526 0288 Mon Fri 8 am 5 pm EST Page 56 of 62 Benchmark 2500 3000 Dimension Drawin...

Страница 57: ...ii Installation Manual APPENDIX A DIMENSIONAL AND CLEARANCE DRAWINGS OMM 136_G GF 210 8 20 2020 Technical Support 800 526 0288 Mon Fri 8 am 5 pm EST Page 57 of 62 Benchmark 2500 3000 Clearance Drawin...

Страница 58: ...Installation Manual APPENDIX A DIMENSIONAL AND CLEARANCE DRAWINGS OMM 136_G GF 210 8 20 2020 Technical Support 800 526 0288 Mon Fri 8 am 5 pm EST Page 58 of 62 Benchmark 4000 5000N Platinum Dimension...

Страница 59: ...tallation Manual APPENDIX A DIMENSIONAL AND CLEARANCE DRAWINGS OMM 136_G GF 210 8 20 2020 Technical Support 800 526 0288 Mon Fri 8 am 5 pm EST Page 59 of 62 Benchmark 4000 5000N Clearance Dimensional...

Страница 60: ...dge ii Installation Manual APPENDIX A DIMENSIONAL AND CLEARANCE DRAWINGS OMM 136_G GF 210 8 20 2020 Technical Support 800 526 0288 Mon Fri 8 am 5 pm EST Page 60 of 62 Benchmark 5000 6000 Dimension Dra...

Страница 61: ...i Installation Manual APPENDIX A DIMENSIONAL AND CLEARANCE DRAWINGS OMM 136_G GF 210 8 20 2020 Technical Support 800 526 0288 Mon Fri 8 am 5 pm EST Page 61 of 62 Benchmark 5000 6000 Zero Side Clearanc...

Страница 62: ...nts in Section 2 4 in favor of references to Benchmark Electrical Power Design Guide TAG 0048 GF 2060 Benchmark Gas Supply Design Guide TAG 0047 GF 2030 Added new Section 2 4 3 Housekeeping Pad Requir...

Отзывы: