Benchmark Platinum-Edge [ii]: Installation Manual
SECTION 2
– INSTALLATION
OMM-
136_G • GF-210 • 8/20/2020 Technical Support • (800) 526-0288 • Mon-Fri, 8 am - 5 pm EST Page
43
of
62
Sequencing Isolation Valve Installation Instructions
Figure 2-14: Sequencing Isolation Valve Molex Connector and Jumper Wire
Isolation Valve Harness
Wire #
Color
Signal
1236
Black
24V Common
1237
Red
24V Hot
1238
White
Valve analog input
1239
Green
Valve analog feedback
1240
Black
Delayed interlock
1241
Black
3. Remove and dispose of the cap with jumper wire attached.
4. Plu
g the Molex connector into the sequencing isolation valve’s connector.
5.
When the Sequencing Isolation Valve is used, the Controller’s
Auxiliary Delay
setting
must be set to 120 seconds. Go into the Controller’s
Main Menu
→
Advanced Setup
→
Ancillary Device
→
Interlocks
screen, and set the
Auxiliary Delay
setting to
120
.