
Benchmark Platinum-Edge [ii]: Installation Manual
OMM-
136_G • GF-210 • 8/20/2020 Technical Support • (800) 526-0288 • Mon-Fri, 8 am - 5 pm EST Page
62
of
62
© AERCO International, Inc., 2020
Change Log:
Date
Description
Changed By
5/25/2020
Rev F:
DIR 20-13
: Updated Figure 2-5a to show new location for
Tridicator on BMK 750/1000 units.
Added Benchmark 5000N.
Updated connection information, Section 2.6.2
Linley
Thobourne
8/20/2020
Rev G:
Removed specific site requirements in Section 2.4 in favor
of references to
Benchmark Electrical Power Design Guide,
TAG-0048 (GF-2060),
Benchmark Gas Supply Design
Guide,
TAG-0047 (GF-2030). Added new Section 2.4.3:
Housekeeping Pad Requirements.
Modified description of terminal 7 & 8 on strip J7, Section
2.11.1:
I/O Board Connections
.
DIR 20-23
: Addition of BMK 4000 & 5000N Dual Fuel units,
Propane pipe d
iameter changed from 2” to 1.5” in Section
2.6.2 and 2.9. (reference ECN
1624-17
)
Updated BMK 4000/5000N Dimensional drawing AP-A-1051,
Appendix A.
Added new Section 2.16:
Next Steps
.
Added BMK 4000/5000N 208V option to Section 2.10.1:
Electrical Power Requirements.
Chris Blair
& Linley
Thobourne