![Watts Aerco Benchmark 750 Скачать руководство пользователя страница 80](http://html1.mh-extra.com/html/watts/aerco-benchmark-750/aerco-benchmark-750_user-manual_4058382080.webp)
Benchmark 750 – 1000 Boiler User Manual - INTERNATIONAL
CHAPTER 6 – SAFETY DEVICE TESTING
Page
80
of
170
AERCO International, Inc.
•
100 Oritani Dr.
•
Blauvelt, NY 10913
OMM-0119_0A
11/03/2016
Ph.: 800-526-0288
GF-130-I
Blocked Inlet Switch
Test –
Continued
3.
Turn off the gas supply ball valve to the Heating Boiler and then complete the following
steps:
(a) Use jumper wires to jump out the Low Gas Pressure switch and the Blower Proof
switch.
(b) Remove the black connector boot from the Flame Detector (see Figure 6-4).
(c) Connect the Flame Signal Generator to the black connector boot.
Figure 6-4: Connecting the Flame Signal Generator
(d) Keep the alligator clip away from bare metal parts until step 4c.
4.
Complete the following with the Heating Boiler operating in MANUAL mode:
(a) Ramp the Heating Boiler up to 100% fire rate and then turn the main ON/OFF
switch on the front of the Control Panel to the
ON
position.
(b) Push the
BACK
button three (3) times to return to the upper level menu.
(c) When the Controller gets into the ignition phase, the Control Panel will show
IGNITION TRIAL
. At that point attach the alligator clip (see Figure 6-4) to any bare
metal surface or ground. The C-More display should now show
FLAME PROVEN
and begin to ramp up to 100% fire rate. Note that no gas or flame is present in the
Heating Boiler at this time.
5.
Wait for the Heating Boiler to ramp up to at least 90% before continuing.
6.
Cover the opening to the Air/Fuel valve, where the air filter was removed (see Figure 6-3)
with a solid, flat object, such as a piece of thick plywood or a thick metal plate.
--WARNING! -
The blower suction is very strong and can pull nearby objects into
the blower’s fan blades.
Do NOT allow anything to be pulled
into the blower!
Do not wear anything that could get caught and
pull you into the blower.
7.
The unit should shut down and display
AIRFLOW FAULT DURING RUN
. This step
confirms proper operation of the
Blocked Inlet
switch.
8.
Remove the cover from the air inlet opening and reinstall the air filter.
9.
Remove the jumper wires installed in step 3 and replace the black connector boot on the
Flame Detector.
10.
Press the
CLEAR
button. The unit should restart.
TO WIRE HARNESS
Flame Detector
Connector Boot
Flame Signal Generator