SECTION 3: INSTALLATION - SITE
OMM-0111_B:
•
GF-146-P
•
10/29/2019
Technical Support
•
(800) 526-0288
•
Mon-Fri, 8 am - 5 pm EST Page 20 of 47
Transporting an AM Series Pool Heating System
1. Remove the two (2) 3/8-16 hex cap screws, washers, and nuts attaching the front of the
assembly skid to the wooden pallet, and then remove the same hardware at the rear of the
unit.
2. Once the assembly is disconnected from the pallet, transport using a fork lift inserted into the
skid, at front (green arrows); or at the sides (yellow arrows), as indicated by in Figure 3-2.
Figure 3-2: Transporting the AM Series Pool Heater
CAUTION!
DO NOT use the lifting lugs on the AM boiler itself to lift the entire AM assembly. They are to
be used ONLY in the maintenance or replacement of the boiler unit.
Shipping Weights
Model
Approx. Weight (lbs.)
AM 399P
920
AM 500P
930
AM 750P
1,205
AM 1000P
1,290
3. When in position, remove all wrapping to prepare for installation.
WARNING!
The floor onto which the unit
is installed must be capable
of supporting the weight of
the unit or the unit and/or
building may be damage.