![Watts 900.000.400 Скачать руководство пользователя страница 10](http://html.mh-extra.com/html/watts/900-000-400/900-000-400_user-manual-and-installation-manual_876924010.webp)
10
BLÜCHER
®
CONNECTED ROOF - REV. 01 - OCTOBER 2020
5.2 Monitor
We recommend that one Monitor is installed next to each drain on your roof. Monitors should
be installed at the primary drainage system and not at emergency outlets and drains. This
gives the system the best conditions to evaluate the performance of the drainage system.