Contents
Description of the unit 5
Package 5
Definitions
5
Specifications
6
Heating power curve
9
Description
10
Operating principle
11
Installation 12
Regulation installation and maintenance conditions
12
Unpacking and reservations
12
Receipt
12
Handling
12
Containment of refrigerant circuits
12
Accessories provided
12
Installation position
12
Installation of the outdoor unit
13
Installation precautions
13
Outdoor unit positioning
14
Condensate drain hose
14
Installing the hydraulic unit
15
Installation precautions
15
Positioning the hydraulic unit
15
Refrigeration connections
16
Rules and precautions
16
Refrigeration connections
16
Creating the flarings
17
Shaping the refrigeration pipes
17
Connecting the flared connections
17
Filling the installation with gas
19
Commissioning procedure
19
Sealing test
20
Additional charge
21
Pump down (Refrigerant collecting operation)
21
Connecting the heating circuit hydraulically
22
General
22
Rinsing out the installation
22
Filling and purging the installation
22
Connecting the Fan convector circuit
22
Electrical connections
24
Characteristic of the electrical supply
24
General remarks on electrical connections
24
Overview of all the electrical connections
25
Cable section and protection rating
25
Electrical connections
on the outdoor unit side
26
Electrical connections
on the hydraulic unit side
27
Outdoor sensor
29
Room thermostat and/or room control unit
29
Start-up
30
Configuring the room thermostat
30
Configuring room control unit
30
"
This device requires for its installation, the intervention of qualified personnel with a certificate of
capacity for handling refrigerants
Installation and operating manual "1364 - EN"
Split system (3-phase)
- 2 -